{"id":1317,"date":"2013-07-26T06:28:37","date_gmt":"2013-07-26T12:28:37","guid":{"rendered":"http:\/\/www.velocity-xl.com\/blog\/?p=1317"},"modified":"2013-12-23T13:13:29","modified_gmt":"2013-12-23T19:13:29","slug":"13-3-electrical-supply-lines","status":"publish","type":"post","link":"https:\/\/www.velocity-xl.com\/blog\/2013\/07\/26\/13-3-electrical-supply-lines\/","title":{"rendered":"13.6 Electrical supply lines"},"content":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068\" data-series-id=\"37\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 31 of 67 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/13-electrical-instrumentation\/\">13 - Electrical \/ Instruments<\/a><\/div><\/div><\/div><p>The way most Velocities are setup is with the master contactor (solenoid) and stater contactor located up front next to the battery. With the starter in the back, this means a fairly large gauge wire running back to the starter. It also means two slightly smaller gauge wires running from the alternators to the front.<\/p>\n<p>Now because I&#8217;m running a 24v electrical system, I get to run smaller gauge wires than the 12v guys. So my starter wires will only be 4 AWG instead of 2 or 0 AWG.\u00a0 This is nice because smaller is lighter, takes up less space and is easier to bend.<\/p>\n<p>Copper wire is used throughout the aircraft. Aluminum is lighter, but there have been numerous documented problems with aluminum wire. One to my &#8220;go to&#8221; guys for supplies is Eric Jones at <a href=\"http:\/\/www.periheliondesign.com\/\">Perihelion Design<\/a>. He&#8217;s supplied me with servo controllers, LED dimmers and switch guards. He also has this very interesting cable called CCA (Copper Clad Aluminum). It&#8217;s an aluminum cable that is covered in copper. So this wire is light weight (aluminum) and doesn&#8217;t have the problem associated with aluminum because it is covered in copper. It&#8217;s the best of both worlds. \ud83d\ude42<\/p>\n<p>Since I&#8217;m still in recovery mode, I decided to install one of the terminals on the cable just to see how it went. Normally, wire terminals are crimped on, but a good pair of crimpers for wire this big costs a lot of money and I only have about 6 to install. So it&#8217;s done in a McGyver fashion.<\/p>\n<p>First I made a tool to hold the terminal and cable with a hole for a punch. Next I had to make a 5\/16&#8243; punch (an old screwdriver fit the bill nicely) Then with the cable and terminal held in position, I used the punch to &#8220;dimple&#8221; the terminal to &#8220;crimp&#8221; the cable. Then using a propane torch, I soldered the cable to the terminal. This will create a strong, permanent connection between the cable and the terminal.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2013\/07\/2013-07-26-IMG_20130726_145300_892.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-1318\" title=\"2013-07-26 IMG_20130726_145300_892\" alt=\"\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2013\/07\/2013-07-26-IMG_20130726_145300_892-150x150.jpg\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Here you can see the dimple and how the solder has completely filled the end of the cable.<\/p>\n<p>Finally, shrink tubing is used to cover the work.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2013\/07\/2013-07-26-IMG_20130726_165243_735.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-1319\" title=\"2013-07-26 IMG_20130726_165243_735\" alt=\"\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2013\/07\/2013-07-26-IMG_20130726_165243_735-150x150.jpg\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>I was able to find some yellow shrink tubing instead of the standard black.<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068 pps-series-meta-excerpt\" data-series-id=\"37\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 31 of 67 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/13-electrical-instrumentation\/\">13 - Electrical \/ Instruments<\/a><\/div><\/div><\/div><p>The way most Velocities are setup is with the master contactor (solenoid) and stater contactor located up front next to the battery. With the starter in the back, this means a fairly large gauge wire running back to the starter. &hellip; <a href=\"https:\/\/www.velocity-xl.com\/blog\/2013\/07\/26\/13-3-electrical-supply-lines\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[45],"tags":[],"series":[37],"class_list":["post-1317","post","type-post","status-publish","format-standard","hentry","category-45","series-13-electrical-instrumentation"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/1317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/comments?post=1317"}],"version-history":[{"count":6,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/1317\/revisions"}],"predecessor-version":[{"id":1598,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/1317\/revisions\/1598"}],"wp:attachment":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/media?parent=1317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/categories?post=1317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/tags?post=1317"},{"taxonomy":"series","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/series?post=1317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}