{"id":869,"date":"2012-04-07T16:10:20","date_gmt":"2012-04-07T22:10:20","guid":{"rendered":"http:\/\/www.velocity-xl.com\/blog\/?p=869"},"modified":"2012-04-24T16:18:59","modified_gmt":"2012-04-24T22:18:59","slug":"5-5-1-install-door-lift-gas-struts","status":"publish","type":"post","link":"https:\/\/www.velocity-xl.com\/blog\/2012\/04\/07\/5-5-1-install-door-lift-gas-struts\/","title":{"rendered":"5.5.1 Install Door Lift Gas Struts"},"content":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068\" data-series-id=\"29\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 1 of 16 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/05-doors-windows\/\">05 - Doors \/ Windows<\/a><\/div><\/div><\/div><p>Once again, I&#8217;ve deviating from the manual. I picked up a pair of Hangar 18 designed door gas strut brackets. These are supposed to cause less deformation in the door, operate smoother and be less obtrusive.<\/p>\n<p>First task is to create hardpoints in the D-tubes that make up the door frame. For hardpoints, I&#8217;m going to use a 2&#8243; x 1-1\/2&#8243; x 1\/2&#8243; block of aluminum. First I drilled and tapped the holes in the hardpoint. Then I located the position of the bracket.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_161144.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-872\" title=\"2012-04-07 IMG_20120407_161144\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_161144-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Next I marked where I would open up the D-tube to slide the hardpoint in.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_175508.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-873\" title=\"2012-04-07 IMG_20120407_175508\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_175508-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>I then sanded the inside of the door frame and the aluminum hardpoint. Masking tape is applied to the outside of the door frame and bracket to keep adhesive from sticking to it.<\/p>\n<p>Then I mixed up some structural adhesive with some cabo to thicken it. The adhesive is applied to the door frame and the hardpoint.The hardpoint is then inserted and the bracket is attached until the adhesive sets.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_181526.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-874\" title=\"2012-04-07 IMG_20120407_181526\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/04\/2012-04-07-IMG_20120407_181526-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Once it set, I patched the d-tube and moved on to the hardpoint on the b-pillar.<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068 pps-series-meta-excerpt\" data-series-id=\"29\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 1 of 16 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/05-doors-windows\/\">05 - Doors \/ Windows<\/a><\/div><\/div><\/div><p>Once again, I&#8217;ve deviating from the manual. I picked up a pair of Hangar 18 designed door gas strut brackets. These are supposed to cause less deformation in the door, operate smoother and be less obtrusive. First task is to &hellip; <a href=\"https:\/\/www.velocity-xl.com\/blog\/2012\/04\/07\/5-5-1-install-door-lift-gas-struts\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[44],"tags":[],"series":[29],"class_list":["post-869","post","type-post","status-publish","format-standard","hentry","category-44","series-05-doors-windows"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/869","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/comments?post=869"}],"version-history":[{"count":2,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/869\/revisions"}],"predecessor-version":[{"id":875,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/869\/revisions\/875"}],"wp:attachment":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/media?parent=869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/categories?post=869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/tags?post=869"},{"taxonomy":"series","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/series?post=869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}