{"id":893,"date":"2012-05-09T08:37:34","date_gmt":"2012-05-09T14:37:34","guid":{"rendered":"http:\/\/www.velocity-xl.com\/blog\/?p=893"},"modified":"2012-05-10T08:55:35","modified_gmt":"2012-05-10T14:55:35","slug":"5-5-1-door-lift-gas-struts-2","status":"publish","type":"post","link":"https:\/\/www.velocity-xl.com\/blog\/2012\/05\/09\/5-5-1-door-lift-gas-struts-2\/","title":{"rendered":"5.5.1 Door lift gas struts"},"content":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068\" data-series-id=\"29\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 4 of 16 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/05-doors-windows\/\">05 - Doors \/ Windows<\/a><\/div><\/div><\/div><p>Now that I&#8217;ve got the door lift situation figured out, it&#8217;s time to work on the pilot side door. I did the initial work on the co-pilot door since that door won&#8217;t get as much use as the pilot side.<\/p>\n<p>Now that I know how the system works, I&#8217;m going do the pilot door a little differently. As in stronger. The first thing to do is create a large backing plate\/hardpoint out of 1\/8&#8243; aluminum.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-08-IMG_20120507_205915.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-895\" title=\"2012-05-08 IMG_20120507_205915\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-08-IMG_20120507_205915-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Then I cut an opening in the top of the D-tube that will accept the plate. I drilled and tapped holes in the plate that will align with the mounting bracket and also drilled holes for rivets. Then I formed the plate so that it matched the contour on the D-tube.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-08-IMG_20120507_205901.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-897\" title=\"2012-05-08 IMG_20120507_205901\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-08-IMG_20120507_205901-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Finally, I spread structural adhesive on the inside of the D-tube and the back of the plate and slid the plate into the D-tube and riveted the plate into position. Once the adhesive set, I inserted a piece of soft foam into the space and left a cavity about 1\/2&#8243; deep that a little longer than the opening I made to get the plate in. Then I mixed a flox\/cabo paste and filled the area behind the plate. This will strengthen the D-tube where the bracket is.<\/p>\n<p><a href=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-09-IMG_20120509_163423.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-thumbnail wp-image-896\" title=\"2012-05-09 IMG_20120509_163423\" src=\"https:\/\/www.velocity-xl.com\/blog\/wp-content\/uploads\/2012\/05\/2012-05-09-IMG_20120509_163423-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Once cured, the area gets sanded down and I&#8217;ll cover it with a layer of carbon Uni and BID.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"pps-series-post-details pps-series-post-details-variant-classic pps-series-post-details-4068 pps-series-meta-excerpt\" data-series-id=\"29\"><div class=\"pps-series-meta-content\"><div class=\"pps-series-meta-text\">This entry is part 4 of 16 in the series <a href=\"https:\/\/www.velocity-xl.com\/blog\/series\/05-doors-windows\/\">05 - Doors \/ Windows<\/a><\/div><\/div><\/div><p>Now that I&#8217;ve got the door lift situation figured out, it&#8217;s time to work on the pilot side door. I did the initial work on the co-pilot door since that door won&#8217;t get as much use as the pilot side. &hellip; <a href=\"https:\/\/www.velocity-xl.com\/blog\/2012\/05\/09\/5-5-1-door-lift-gas-struts-2\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[44],"tags":[],"series":[29],"class_list":["post-893","post","type-post","status-publish","format-standard","hentry","category-44","series-05-doors-windows"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/comments?post=893"}],"version-history":[{"count":2,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/893\/revisions"}],"predecessor-version":[{"id":899,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/posts\/893\/revisions\/899"}],"wp:attachment":[{"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/media?parent=893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/categories?post=893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/tags?post=893"},{"taxonomy":"series","embeddable":true,"href":"https:\/\/www.velocity-xl.com\/blog\/wp-json\/wp\/v2\/series?post=893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}