6.7.1 – Spar Positioning

This entry is part 2 of 42 in the series 06 - Fuselage

The last task for the day was to create a rectangular opening just forward of the firewall on each side of the fuselage for the main spar. The spar is the primary mounting point for the main wings.

Here are the lines that mark the opening on the left side.

And then, after cutting the opening.

Series Navigation<< 6.5.2 – Rudder Pedals6.1.5 Keel Hardpoints >>