12.3.6 Nose Oil Cooler

This entry is part 33 of 50 in the series 12 - Engine / Propeller

Time to make an engineering change. The oil is cooled with two oil coolers. The primary oil cooler is in the back with the engine. There’s a secondary oil cooler in the nose that’s used to cool engine oil and provide cabin heat. A factory supplied NACA duct is installed in the side of the nose, the oil cooler is mounted and another duct exits the bottom. Two 1 1/2″ tubes are inserted into the exit duct that supply warm(er) air to the cabin area. A small flap/diverter is installed in after the tubes that would block the air from exiting outside and instead directs it to the cabin. Here’s the problem: At cruise speed, the air is forced through the oil cooler at an incredible rate. And in the winter, the air at cruise altitude can 20 – 30 below zero. Given that, I think the oil cooler would increase the temperature of the outside air maybe 50 degrees. Which means that the cabin would be “heated” with 30 – 40 degree air.

So here’s the plan: I’ll put an additional flap between the NACA duct and the oil cooler to block the outside air. Then run a return line from the cabin to the oil cooler. That way I’ll be heating inside air that already warm.

This plan requires fabricating almost all the parts.

Here’s the plan view. On paper.

I’ll make a form out of foam and cover it with fiberglass. I used a spreadsheet based the formula for the NACA design developed by the NASA predecessor in the 1950’s.

Here’s the form made from glued blocks of foam.

This is the result. Needs a little cleanup but not bad.

This is the duct for the air after it goes through the oil cooler and then out the bottom of the fuselage. I had to make a flange where the oil cooler mounts to it. Because the geometry of the design is different, I had to make a slight modification to the opening so it would cover the entire oil cooler.

Duct cleaned up with the flap that blocks outside air.


Flap open. You can see the inside return air port.

The flap mounts to the bolt that is filed down, drilled and tapped.

Now it’s time cut the opening for the NACA duct. This part always drives me nuts! I’m cutting a hole in the airplane! What if I cut it wrong? Oh well.

Here’s the mark for the opening


Inside view where the duct will go.


After the cut. Hope it’s in the right place.


Duct installed.


Inside view of the installed duct.


The whole assembly installed with oil cooler.

View from the outside with the door open and closed. You can see the oil cooler inside on the left picture.

Partially disassembled. This is the lower portion of the whole assembly (where the heated air exits the bottom of the fuselage. With this lower door closed, the heated air will be diverted into the cabin through two two tubes which will have flexible tubing that supply warm air to the pilot and co-pilot side of the cabin.


Same view with the flap open that blocks the cabin supply lines and exhausts the air outside.

Later, I’ll attach control arms to the pivots for the two doors. Then cables can be attached which will allow opening and closing the doors from inside the cabin

7.5 Main Gear Bushings

This entry is part 27 of 39 in the series 07 - Landing Gear

Once the transverse bulkheads were in and the layups were complete, it was time to permanently install the main gear bushings. The main landing gear is located between the firewall (at the very rear of the fuselage) and the main gear bulkhead. There is a hold drilled in the main gear leg where a steel sleeve is installed. A bolt goes through the two bulkheads and through the landing gear leg. The gear then pivots on this bolt which allows it to be raised to the retracted position. Where the bolt goes through the two bulkheads, an aluminum bushing is installed as a bearing point. Up until now, all these components were present, but not permanently installed.

Left main gear leg viewed from the inside. This is before the transverse bulkhead was installed. But you can see the gear leg, pivot bolt and forward bushing.

 2008-05-13 0726 IMG_6909

View from the inside showing the bolt and aluminum bushing temporarily installed.

 2008-05-13 0726 IMG_6910

My first order of business is to get the bushings in place. I removed the bolts, pulled the bushings, and coated the contact surfaces with structural adhesive. Then put everything back together and lightly tighten down the nuts. The manual says to also glue the sleeves in the gear leg at this time, but I was nervous that I wouldn’t get everything in position before things started setting up.

Once the bushing were in place, I pulled everything apart and used structural adhesive on the steel sleeves in the gear legs and put everything back together again. That’s when I discovered… a glitch.

Turns out when I tightened everything down in the previous step while the bushing were setting up, I didn’t get the nut very tight. Since the bolt head is on the outside and the nut is on the inside, I couldn’t hold a wrench on both. The result was that the nut wasn’t tightened enough. This resulted in an excessive space between the two bushings which allowed the gear leg to move front to rear. Since the sleeves had adhesive on them, I decided to position the gear leg as best I could and figure out what to do next.

I checked with the factory and they said I could either stuff some washers in or I could remove the bushings and put them back in. This was a bit of a surprise since I thought the adhesive was “permanent”. Turns out that if the adhesive is heated to the right temperature, it’s possible to remove the bushings. I removed the left gear again, put a soldering iron in the bushings for about 15 – 20 minutes and using a home-made press they popped right out. Then I cleaned up the openings. I hoped that I would be able to glue the bushings back in and be finished. But the steel sleeve wasn’t where I wanted it. In hindsight, I should have pulled the gear leg when I discovered the gap, removed the sleeve from the gear leg and cleaned off the uncured adhesive. 

So now I had to remove the sleeve. Which means sticking a soldering iron in the sleeve, waiting 20 – 30 minutes and with Steve’s help, we got the sleeve out.

Then I covered the bushings with adhesive and bolted everything back together. Once that cured, I removed the gear leg, put adhesive on the sleeve and put everything back together.

Once that one done, I had to put a two layer triax layup on the back of the firewall over the bushings and over the front of the main gear bulkhead over the bushings.

 All this took about a week. It should have a taken a couple hours. Pretty steep learning curve (not happy with this type of progress). 

Waiting for Steve to get the wrench on the inside nut.

IMG_2058

7.4.3 Transverse Bulkhead Installation

This entry is part 26 of 39 in the series 07 - Landing Gear

After spending the last two weeks on the road, I didn’t get much building done. I did get some building related work done. Malcolm Collier of Hangar 18 fame is a professional builder who works with builders that don’t have much available time to build. His work is some of the finest and he has made some impressive innovations to the Velocity design. So after class was done on Friday, I flew over to Greenville, SC and hung out with Malcolm. I got some good ideas and some great tips. Then I had to spend the next week in New York City.

Once I got back from NYC, I resumed building. One of my tasks was getting the main gear positioned and aligned so I could permanently install the pivot bushings. Now consider that this airplane (when taking off and landing) is going to be moving down a runway at about 70 MPH. So the wheels should be in exactly the right location. Here’s another situation where the manual doesn’t go into a lot of detail.

The gear legs should be symmetrical and a line between the wheels should be perpendicular to the longitudinal axis. But how to determine that?

Here’s what I did. First, I leveled the plane front the rear and side to side. Then using a plumb-bob, I marked the centerline of the plane at the front and rear on the floor and drew a line between the two points. So now there’s a line on the floor from the front to the rear of the fuselage.

The vertical line to the centerline.

2008-05-12 1929 IMG_6897

Next I ran a string from one of the wheel mounting holes on the right gear leg to the corresponding hole on the left gear leg. The I measured the distance between the two gear legs and put a mark on the string at the halfway point.

Then, using the plumb-bob from the mark, I adjusted the gear legs until the mark on the string was in the middle.

2008-05-12 1930 IMG_6898

  I actually put two marks on the string so I could easily see when the plumb-bob string was in the middle.

And here’s the plumb-bob on the floor. Dead-solid-perfect.

 2008-05-12 1930 IMG_6899

Next I had to get the gear legs positioned front to rear. For that, I used a laser. I pointed the laser through one of the wheel mounting holes on the gear leg so that it went through the same hole on the other leg.

From the right side, you can see some of the light from the laser on the bottom left hole.

 2008-05-12 1932 IMG_6901

 Then, I moved the the plumb-bob until it was hit by the laser.

Here’s the laser hitting the plumb-bob line.

 2008-05-12 1932 IMG_6902

I then put a mark on the floor. I did this at a couple locations between the gear legs. Next I drew a line connecting the dots.

 2008-05-12 1933 IMG_6903

Checking the location of the line just to make sure nothing changed.

Finally, I just had to check that the centerline and the line between the gear legs was perpendicular and adjust if necessary.

Now the whole operation start to finish was about an hour but I must have spent half the day figuring out how to do it in the first place.

Next, I had to install and reinforce the transverse bulkhead. This relatively small piece connects the firewall to the main gear bulkhead. The plans call for the piece made to made from foam and covered with two layers of triax. I felt that using some plywood wouldn’t add much weight and would add strength. To determine the correct size, I used cardboard and trimmed it until it fit. Then I transferred the shape to a piece of plywood.

Plywood transverse bulkhead

 2008-05-15 1451 IMG_6915

Then I had to determine the shape of the triax fiberglass that would cover it. I used small pieces of posterboard and taped them together.

 This is the outside triax template.

 2008-05-15 1844 IMG_6917

Here’s the outside view of the transverse bulkhead with the layup in place.

 2008-05-18 0908 IMG_7111

Inside view on the transverse bulkhead.

2008-05-18 0908 IMG_7112

7.8.1 Hydraulic Power Pack Installation

This entry is part 25 of 39 in the series 07 - Landing Gear

Then I went to mount the hydraulic pump assembly. This is an electric motor mounted to a pump which is mounted to a reservoir. But when I tried to mount it, the tabs didn’t meet the bulkhead… The reservoir was in the way.

 2008-04-23 1135 IMG_6798

Here you can see the two mounting holes that I think should fit against the bulkhead. I checked pictures from some other builders and it seems I’m right.

Here’s another builders bulkhead with attached pump.

064

But after I emailed the factory, I was told that I need a bracket. So now I’ve got to wait for that.

6.6.2 Install Instrument Panel

This entry is part 25 of 42 in the series 06 - Fuselage

The flow chart said to mount the instrument panel. This seems a bit premature, but hopefully the person that wrote the manual knows what they’re doing. (turns out they didn’t)

  2008-04-21 1218 IMG_6791

The instrument panel is supposed to be 21″ aft of the canard bulkhead (That’s the bulkhead that the rudder pedals are mounted to). To make sure I get the right location, I marked a couple 3/4″ x pieces of wood and clamped them to the canard bulkhead. This will give me the right distance.

Then I tried to put the panel in. Tried is the operative word. It’s made oversized so I have to trim it to fit. Which means put it in as far as possible and mark where it binds, pull it out, trim and repeat. And repeat, and repeat.

 Once I got the panel to fit in the correct location, I applied duct tape to the back edges. I then applied a 2 BID layup on the left, right and bottom middle of the panel and let it cure overnight. In the morning, I drilled holes through the panel where the layups were.

 2008-04-23 1847 IMG_68002008-04-23 1848 IMG_6804

New mounting tabs.

2008-04-23 1842 IMG_6799

Panel temporarily held in place with clecos.

Here’s what I learned much later:  The panel didn’t have to get installed now. It could have (and should) have waited until much later.  Had I waited, I would have mounted it farther aft.  As it is now, with the seat in the position where I would be flying from, it’s a decent reach to get to the panel.

9.5.1 Sump Tank Hardpoints

This entry is part 7 of 18 in the series 09 - Fuel System

I’ve been working on the sump quite a bit. After getting the hardpoints installed, I’ve been sanding the inside and spreading epoxy to make a smooth surface. The inside was incredibly coarse. I probably put 3-4 coats of epoxy down (and sanding in between). But just as I think I’m ready to drill and tap for the fuel lines, I discover two “minor” problems.

The engine I’m installing would rather have 1/2″ fuel lines instead of 3/8″. The problem is the the 1/2″ fittings will interfere with the main gear when it retracts. so that means I’ll need to install two new hardpoints that won’t be in the way.

An even bigger problem is that the lower engine mounts are going to be in the same place as the tank.

Inside of firewall. The two squares with the “X” is where an engine mount bolt will be.
2008-04-18 1013 IMG_6763
Same view but with the tank in place.

2008-04-18 1014 IMG_6764

How do you get to the bolts if the tank is in the way? Or how do you mount the tank if the bolts are in the way?

A call in to the factory reveals the best way to work around the issue of where the fuel lines go in.

Instead of mounting the two feed lines on the top front of the tank, they’ll have to go on the side. Which means adding two more hardpoints for the fuel lines.

As for the engine mount bolt issue, a somewhat more… Neanderthal solution is called for… Check it out:

Before

2008-04-22 1652 IMG_6792

After.

2008-04-22 1714 IMG_6794

Elegant, huh?

Another view.

2008-04-22 1714 IMG_6795

Won’t hold much fuel like that.

New corner installed.

2008-04-23 1007 IMG_6797

The new corners are covered with 2x BID inside and out.

Now here’s where not having built one of these airplanes before can bite you.  I’m working on this because the “Flow Chart” has it listed as task 40. Well, I’ve done 1-39 so I’m doing this. But what I learned much later is that it doesn’t have to be done now. And if I had waited, I could have made smaller, rounded clearance corners that would match up to the engine mount bolts exactly and allowed more fuel. As it is, it’s a little tight where one of the enging mount bolts is.

6.2 Assemble Seats

This entry is part 26 of 42 in the series 06 - Fuselage

I decided to build up at least one seat that I can use for testing. Basically, I have a seat bottom and a seatback. I have to screw these to hinges. The hinges allow the seatback to fold forward so people can get in a out of the back seat. I’ve got a new style hinge. I’m rapidly coming to the conclusion that new=a lot more work. The old style had a fixed upright position. Which means that you had to decide when you were building the seat. The new style lets you adjust it at anytime, just like a car seat.

2008-04-19 1712 IMG_6782

Here’s the new style hinge.

2008-04-19 1714 IMG_6787

Old style hinge.

But the problem is that I couldn’t get the seatback to fit the hinge. I tried and tried. I tried all sorts of different ways of getting it to fit. It just wouldn’t. Then I started looking at other peoples build sites. That’s when I discovered that nobody else have seat hinges like mine.

So I called the factory. They said I would have to send the seatbacks back down to Florida to be modified for use with the new seat hinges. 🙁

6A.3.1 Rudder Pedal Installation

This entry is part 24 of 42 in the series 06 - Fuselage

I received the rudder pedals from Velocity. In past Velocity models, the rudder pedals behaved differently than most other airplanes. The (old style) pedals were independent.  Meaning that you could depress both pedals at the same time. Once a pedal is pressed past the point that deploys the rudder, pressing the pedal further would activate the brake. There was one advantage to this in that you could press both pedals in flight and by deploying both rudders achieve a kind of speed brake.

But the rudder pedals of nearly all other airplanes are interconnected. Meaning you could only press one at a time.  And brakes were activated by pushing on the top of the pedal. Hence, “toe brakes”.

The new, upgraded rudder pedals are like that of traditional airplanes.  And those are what I bought.

So I mounted the pedals on the torque tube assembly and began trying to figure out how high to mount the assembly.

Here the pedal assembly is just resting on the keel.

2008-04-18 0936 IMG_6755

To determine if the height from the floor was correct, I put some pieces of foam to create a height of about where I thought the seat would be then sat down I tried out rudder pedals at different heights.

2008-04-18 0936 IMG_6756

Once I had to height dialed in, I bolted the whole assembly to the canard bulkhead.

 

7.2.5 Nose Gear Guides

This entry is part 24 of 39 in the series 07 - Landing Gear

Here’s a picture of the nose gear retracted.

2008-04-06 0842 IMG_6712

If the nose gear gets turned while it’s retracted, the metal “fork” will catch on the edge of the opening and won’t be able to extend (I’ve been there before and it ain’t fun!).

To prevent this from happening, two “guides” are made to keep the nose gear from rotating once it’s retracted. The guides are made by creating flat, 1/8″ thick layups and letting them cure. Then cutting them out and attaching them to create the guides.

Once the layups cured, I cut out the guides and supports for the left and right.

2008-04-06 0843 IMG_6714

Then the supports are attached to the guides with 5-minute epoxy. When that sets up 2 BID layups are used to permanently attach the supports to the guides.

2008-04-06 0849 IMG_67152008-04-06 1004 IMG_6717

Once those layups cure, they’re trimmed and then the guides are fitted to the opening in the nose with 5-minute epoxy. When that cures, a radius is created with micro and 2 BID attaches the guides to the fuselage.

2008-04-14 1517 IMG_67372008-04-14 1518 IMG_67382008-04-14 1535 IMG_6741

Trimmed and ready to go.

2008-04-15 0903 IMG_6748.

6.1.2 Keel Access Cover Flanges

This entry is part 23 of 42 in the series 06 - Fuselage

I made the flange for the large opening on the copilot side of the keel in Florida.  But the forward and aft access covers need to be dealt with.  This is accomplished by taking the pieces which were cut off to make the opening and adding fiberglass layups over them which extend to the keel. The covers are first taped into place then the area around the opening is covered with duct tape.

2008-04-05 1310 IMG_67082008-04-05 1310 IMG_67092008-04-05 1310 IMG_6710

Next BID layups are placed over the cover and adjacent area of the keel.

2008-04-13 1157 IMG_67262008-04-13 1157 IMG_6727

When it cures, I drilled the holes for the screws that would hold it in place. The cover and flange is gently pried away from the keel.  The flange is then trimmed back.

2008-04-13 1202 IMG_67292008-04-13 1203 IMG_6730

All that’s left is to put nutplates on the keel and now the access cover can be screwed into place.

2008-04-13 1614 IMG_6734 2008-04-13 1615 IMG_6735 2008-04-13 1620 IMG_6736