9.5.1 Sump Tank Hardpoints

This entry is part 6 of 18 in the series 09 - Fuel System

According to the “flow chart” that lists the order of tasks, one of the things I have to do is build the fuel sump. In most planes I’ve flown, the fuel is fed to the engine from the two fuel tanks (one in each wing) by using a fuel selector. Low-wing airplanes require you to select either the “right” or “left” fuel tank. With these planes, you have remember to switch tanks every 30 minutes or so in order to keep the plane in balance. On the Velocity, a “sump” is used. This is a small (about 3 to 5 gallon) tank that is mounted at the bottom of the firewall. Fuel drains from both tanks into the sump which then feeds into the engine. Brilliant!

The fuel sump is pre-molded but is the front is not attached. There are a couple hardpoints for fuel lines that have to be bonded on.  So one of the tasks today is to bond these hardpoints on. This similar to the hardpoints on the floor for the seats. So they are epoxied into place and they covered with 2 layers of BID.

6.2.1 Seat Hardpoints

This entry is part 22 of 42 in the series 06 - Fuselage

Next was front seat hardpoints. This is where the front seat are bolted to the floor.

This is a view of the floor looking froward where the pilot seat will be. On the right is the keel and the left (just out of view) is the door opening.

2008-04-02 1313 IMG_6695

This is looking at the floor from the pilot side door. I’ve laid out the positions of the 2″x2″ square hardpoints according to the manual.

2008-04-02 1314 IMG_66962008-04-02 1314 IMG_6697

But wait, I’m a bit taller than the average person. So I decided to make a engineering change and move the pilot seat back an inch.

2008-04-02 1320 IMG_6699

Because the floor is not flat (it’s lower in the center than on the sides), the outboard hardpoints have to be recessed so the the seat will be level. Here’s where one of the outboard hardpoints will go.

 2008-04-02 1340 IMG_67002008-04-02 1340 IMG_6702

The next temporal black hole was how to attach initially. They’re going to have two layer of BID over them, but what to stick them on with to hold them in place. One place in the manual said:

 “The inboard hardpoints can be installed on the surface and covered with two plies of BID.”

The other place said “Alphapoxy”.  Now I haven’t had an occasion to use that before but my understanding is that it’s a lightweight epoxy. Now there’s going to be two layers of BID over top and that’s where the strength is going to come from so it probably doesn’t make THAT much difference but when in doubt, I’m going to spend time to remove all doubt. So after reading and re-reading, I gave up and called the factory. Turns out it doesn’t really matter. ARRGH! Another hour wasted. Maybe I should ship it back to Florida and spend a week every month down there?

Here are the hardpoints in place with micro bevel ready for BID layups.

  2008-04-02 1341 IMG_6703 2008-04-02 1341 IMG_6704 2008-04-03 0911 IMG_6705 2008-04-03 0911 IMG_6707

7.4.1 Gear Leg Cut Out

This entry is part 23 of 39 in the series 07 - Landing Gear

I decided to continue with the last thing I was working on in Florida (Main Landing Gear – MLG). When they build the fuselage, They mount the MLG but only to the point that they can roll the fuselage around. They won’t retract. The first task was open up the side of the fuselage so the legs could come up.

Here’s the left side main gear leg.

2008-04-02 0830 IMG_6689

You’ll notice where the leg exits the fuselage, there’s an opening that’s a little bigger than the leg itself. When the gear is raised, that leg will swing up. But the hole isn’t big enough to allow that which means it has to be… bigger. But how big? Here’s my first dilemma: The book doesn’t really say. I was expecting a template that you would lay against the side and mark where to cut. Nope. No template. The book just says cut it, not how big. I’m a little nervous cutting when I don’t know where to cut so I fussed about this quite a bit. Down in Florida, I would have looked at another plane or asked someone and have been done. Instead, I reread the manual about 30 times, looked at pictures on other builders websites and read the manual again thinking I overlooked something. Finally, I just raised the leg and cut a little. And repeated this maybe 12 times until the leg would raise the correct amount.

This the result of 2 hours of research and 45 minutes of cut, check, cut, check, cut check…

2008-04-02 1016 IMG_6692

Gear leg up. (I removed the wheel to make it easier to work with.)

 2008-04-02 1017 IMG_6693

Once I knew how big the opening needed to be, the other side took about 15 minutes. This is where the time black hole is going to come from. The whole task is probably slated to take 30 minutes for both sides, but it took me over 3 hours.

00 Shop Prep

This entry is part 23 of 28 in the series 00 - Prep/Logistics

Trying to get the shop organized. Space is a bit tight so I’m trying to get things moved around so that I won’t be tripping over stuff.

For doing fiberglass prep, I built a 4×8 top for my tablesaw.

2008-03-09_16.19.49

All the small parts (nuts, bolts, brackets, fittings, etc.) come in small ziplock bags that are in large ziplock bags for each major assembly (landing gear, fuel system, control system, etc.). It’s a real pain digging through 50 little ziplock bags looking for a washer. I did a lot of this in Florida at the factory. So I went to Lowes and got some utility boxes just for the hardware. I spent most of the day getting that stuff sorted out.

2008-04-02 0829 IMG_66862008-04-02 0828 IMG_6685

The next task for the day was building a platform for getting in and out of the fuselage. Without this, climbing in and out gets real old, real fast.

 2008-04-02 0829 IMG_6687

The final job was setting up the epoxy pump. There are about four different types of epoxies used on this project. Most are mixed at a 1:1 ratio. But the epoxy that will be used the most is mixed at a 44:100 ratio. Some people use a scale. That would be fine except it’s takes time and it’s easy to screw it up. So I purchased a metering pump. It has two tanks and a single lever that will dispense whatever ratio I want. But I had to calibrate it. Which meant I had to pump a sample of the resin and hardener into two separate containers and then weigh them. Then calculate the ratio, adjust the metering and do it again. And again. And again. And again. Until I got it to 44:100.   

00 Airplane Arrives

This entry is part 22 of 28 in the series 00 - Prep/Logistics

We have an airplane. And I think I should have built a bigger shop.

At around 3:30pm, Dan Fast pulled in the driveway.

 2008-03-15 1434 IMG_5998

Because I went ahead and mounted the center wing spar, the fuselage had to be transported almost on it’s side.

2008-03-15 1434 IMG_6000

Me and my son Steve. That’s the left wing we’re standing in front of.

2008-03-15 1435 IMG_6001

Dan removing all the straps that held everything in place.

2008-03-15 1439 IMG_6003

The wings are in.

2008-03-15 1453 IMG_6004

The left main wheel was removed so that’s got to be reinstalled.

2008-03-15 1456 IMG_6008

It takes four people to get the fuselage off the trailer and on it’s own wheels. With me, Dan and Steve, we needed another person, the bigger the better. So we made the call to our good friends Tim and Anne. Here’s Tim with Steve probably wondering how this thing is supposed to fly.

2008-03-15 1518 IMG_6012

Tim’s wife Anne brought the necessary celebratory refreshments.

2008-03-15 1515 IMG_60102008-03-15 1515 IMG_6011

The following show the fuselage coming off the trailer and into the shop.

Unloading

All done!

My wife Ann (left) with Tim’s wife Anne (right). It’s got to be good mojo to have a couple hot babes celebrating the new project, right?

2008-03-15 1543 IMG_6040

Family photo. Me, Ann and Steve.

2008-03-15 1537 IMG_6039

 Two more pictures. These are from the web cam.

 Before

before

After

 after

 See what I mean? I should have built a bigger shop.

 Next, I get to do inventory… again.

00 Shop Prep

This entry is part 2 of 28 in the series 00 - Prep/Logistics

For the past two weeks I’ve been working on the annual of the Cessna and getting the shop ready so when the plane arrives I can start working on the plane.

One of the things that I need is a heated epoxy cabinet. The epoxies that will be used need to be stored at a relatively narrow temperature range. I knew this, but I thought that since the shop is heated, I wouldn’t have to worry about that. When I was in Florida, the shop I was working in kept their epoxy in a heated cabinet. And that was Florida! If the epoxy gets too cold it becomes thick and doesn’t flow very well.

I had originally planned on building a cabinet, but while shopping for the heating parts at the local home improvement store, I ran across a simple cabinet for $49.

2008-02-24 IMG_5928

I lined the inside with 1/2″ foil faced insulation.

2008-02-24 IMG_5929

Then I installed a thermostat and a single fixture for an incandescent light bulb. I was going to put in two fixtures, but I wasn’t sure if I needed two so I decided to put in one and add the second if required.

 2008-02-24 IMG_5930

To maintain about 70 – 80 degrees, the 75 watt light bulb is on about 15% of the time.

During construction, I’ll need to retract the landing gear from time to time so I’ll need some way to support the plane. The front will be easy since a sawhorse will fit under the nose perfectly. For the back (under the wings) I could use Airplane Jacks, but they’re rather expensive since they’re designed to work under different types of airplanes. While I was down at the factory, I saw a couple different types of fabricated jacks. So here’s what I did:

I went to Harbor Freight (I’m really starting to like that store) and picked up a couple 6 ton hydraulic bottle jacks.

2008-02-24 IMG_5932

Once it’s completed, the airplane will only weight about 2,000 pounds so I don’t need that much capacity, but these jacks had a longer throw than the 2 ton jacks and they only cost $12 each!

Then I had to make them work for the 37″ – 42″ span under the wing. So I used some leftover 1/2″ plywood from when I built the shop and made a base.

2008-02-24 IMG_5934

With the jack on top, it’s the correct height to raise the wing. I haven’t decided how I’m going to secure the jack to the top of the stand. I’m thinking something along the lines of lag bolts with fender (wide) washers around the edge.

Now I’m off the New York City for a week to teach an ACCS class. Then I’m in Downtown Chicago for a week teaching an ICND1 class. After that, I’m hoping the airplane will arrive.

00 Sebastian Pre-Departure

This entry is part 28 of 28 in the series 00 - Prep/Logistics

My last day at the Builders Center. Not all of the parts were brought over from the production facility so once I finished the inventory I rode over to the factory and sat down with Ken to go over the missing parts. Most of the missing items were already boxed up and ready to ship. A couple items were on backorder. The few remaining missing parts (it’s possible that I used them and forgot to mark them off) he just grabbed them out of inventory. No questions asked.

I also found out that the wings would not be ready for transport for two weeks. My plan was to have Travis arrive on 2/18 with the airplane and stay for a couple days to help get started with the strakes. After the two weeks in the middle of February, I’m not going to have much time to dedicate to the build until the 10th of March. Frustrating. But since it’s a two year project (hah!), three weeks isn’t that much of a setback… I guess.

I did get to actually do some work on my wings.

Here I’m fitting the pocket for the rudder bellcrank earlier in my visit.

2008-01-26 IMG_2056 (Large)

By the time I was packing up to leave, we had finished glassing the wings and winglets and the lower winglet is being attached.

2008-02-01 IMG_5908 2008-02-01 IMG_5911

Considering that with the fastbuild option, my amount of work on the plane is 51%, having worked on the wings puts me well over 51%. 🙂

6.7.3 Main Spar Triax Layups

This entry is part 21 of 42 in the series 06 - Fuselage

The main spar is an incredibly over-engineered C-beam that protrudes out each side of the fuselage about 5 feet. The main wings will bolt to this spar so it’s very important that it be securely attached to the fuselage. The initial installation is done with structural adhesive. But that’s only a start.

The first step is to make a foam bridge from the top of the spar to the top of the main gear bulkhead. Here’s the left side with a piece of divinycell foam bridging the space between the top of the spar and the top of the gear bulkhead.

 2008-01-30 IMG_5896

Here’s the right side after I’ve coated the foam with a slurry of epoxy and microballoons. I’ve also created fillet in the corners to make an easier radius for the layups.

 2008-01-30 IMG_5897

The same location with all the layups in place.

2008-01-30 IMG_5898

At the location above the spar, there are 10 layers of triax. Some of the layups run down the foam bridge and go almost to the floor. Others go towards the windows. In all, there are 12 separate pieces of triax. And that’s just on one side. The light colored patches are peel-ply. Thin dacron that’s placed over the layups and makes the surface of the fiberglass smooth. Very important at the edges since without it a lot of sanding is required.

The following day, did the left side spar reinforcing layups. No pictures since it’s the same thing I did yesterday. But, I was done by lunch

There are some really sharp edges so it’s a good idea to hit the edges with some sandpaper otherwise lots of blood will be left behind. 

IMG_2051-a

 

00 Task List

This entry is part 1 of 28 in the series 00 - Prep/Logistics

Tasklist

The manual that I’m working from is arranged by topic (wings, landing gear, fuel system, etc.). The plane is not built by starting a page one and working through the manual sequentially. There is a  “flow chart” that lists the tasks to be performed in the order they are supposed to be done in.

So to get an idea of what I’m doing, here it is. Some of the tasks are missing because they don’t apply. For example, there’s a fixed landing gear version which has tasks that I don’t do. I’ve removed those steps. So if you notice some missing numbers, that’s why. If it’s red, it’s done!

   1.    ✔︎  Read chapter one of your manual and review the construction DVD’s
   2.    ✔︎  Cut out Doghouse
   3.    ✔︎  Cut out and install premolded NACA scoops
   4.         Install Overhead plenum NACA (do not install plenum until flipping airplane)
   5.    ✔︎  Fit keel in airplane and then remove to install control system
   6.    ✔︎  Install wood hardpoints for control system in keel
   7.    ✔︎  Cut out and layup inspection covers in keel
   8.    ✔︎  Install nut plates to hold inspection covers
  12.   ✔︎   Cut out nose gear door hinges
  13.   ✔︎   Install top Triax pads on firewall for Continental engine
  14.   ✔︎   Complete fiberglass portion of nose gear door installation
  15.         Install Heater flapper valve and aluminum outlet tubes in oil cooler exit
  16.         Cut out oil cooer inlet and outlet ducts
  17.         Install front oil cooler ducts
  18.   ✔︎   Install rear aileron control bracket to keel rear section
  19.   ✔︎   Install aileron torque tube and control stick in keel
  20.   ✔︎   Mid bearing support installed in keel
  21.   ✔︎   Install main gear and nose gear cylinder
  22.   ✔︎   Install AN fittings into main and nose gear cylinders (tape over the ends)
  23.   ✔︎   Install flexible hydraulic lines between nose and main gear cylinders
  24.         Fit and install battery tray
  25.         Fit and install Landing Light Assembly (no landing light in the nose)
  26.   ✔︎   Structural Adhesive front of keel in place
  27.   ✔︎   Install front keel stiffening layups
  29.         Install nose gear bushing plates
  30.         Glass edges of canard cutout to seal it
  31.         Fit and fair in nose access cover
  32.   ✔︎   Install nose gear gas spring and shock assembly
  33.         Install nose gear door cylinder and assembly
  34.         Install RG hydraulic power pack
  35.   ✔︎   Install MG pulley and cable assembly
  36.         Install rudder pedals
  37.         Fit instrument panel into airplane
  38.         Install seat hardpoints
  39.         Use Velocipoxy and micro to fair in back of windows
  40.         Construct sump tank
  41.   ✔︎   Glass side of canard bulkhead opposite the flange
  42.         Install sequence valve assembly
  43.         Install Dump Valve
  44.         Install nose gear guides
  45.         Install hydraulic power pack
  46.         Install hard lines for RG system
  47.   ✔︎   Install Center Spar
  48.   ✔︎   Triax reinforcements between the center spar and the gear bulkhead.
  51.         Place airplane on jacks and remove main gear
  52.         Cut out fuselage to allow main gear retract, complete transverse bulkhead
  53.         Install main gear bushings
  54.         Triax over main gear bushings
  55.         Permanently install steel bushings in gear legs and make aluminum spacers
  56.         Install straws on MG for brake lines
  57.         Install canard attachment reinforcements (triax)
  58.         Install Canard bushings
  59.         Complete all canard Triax reinforcements
  60.         Install hinges on elevators
  61.   ✔︎   Install hinge arms in canard
  62.         Attach canard tips
  63.   ✔︎   Install concentric torque tube
  64.         Install counterweights
  65.         Check balance of elevators
  66.         Install elevator pitch trim actuator
  67.         Install main gear
  68.         Install main wings prep for strake install
  69.         Temporarily install doors (hinges do not have to be completed yet)
  70.         Fit lower strake
  71.         Cut out baggage access opening
  72.         Install lower strake bottom
  73.         Fit top strake
  74.         Remove wings to provide more space
  75.         Glass dyvinicel sheet to make fuel tank baffles
  76.         Cut out opening for gear and wheel well
  77.         Fit gear and wheel well
  78.         Cut out baffles a little larger than templates
  79.         Glass top flange on wheel well
  80.         Fit baffle bottoms to bottom strake
  81.         Fit baffle tops to top strake
  82.         Reposition all baffles in bottom strake and tack in place
  83.         Glass bulkheads and baffles to lower strake
  84.         Install hardpoint for fuel vent and main fuel line
  85.         install sight tubes
  86.         Install fuel caps in strake top
  87.         Seal fuel tank with 2 coats of Jeffco or EZ-poxy
  88.         Coat strake top with Jeffco or EZ-poxy in fuel tank area
  89.         Cut wing access bolt hole
  90.         Practice fuel strake top installation with partner
  91.         Install strake top
  92.         Cut wing from strake
  93.         Remove wings
  94.         Cut leading edge from strake that will go on the door
  95.         Install door and glass leading edge of strake to it
  96.         Install outboard end stake reinforcement
  97.         Finish glassing fuel tank bottom seams-back of spar-strake top and bottom
  98.         Pressure check each main fuel tank
  99.         Complete finish work between strake top and fuselage
100.         Reinstall wings
101.         Complete finish work between strake top and wing
102.         Remove wings
103.         Flip airplane
104.         Finish glassing on exterior of fuel tank top seams
105.         Complete finish work between strake bottom and wing
106.         Complete glass work between strake top and inside of baggage well
107.         Install overhead fresh air plenum
108.         Fit main gear doors and install attach brackets onto gear legs
109.         Fill sand and prep gear legs for primer
110.         Complete all finish work on bottom of airplane.
111.         Prime and prep for paint
112.         Remove wings
113.         Flip airplane back onto it’s gear
114.         Install sump tank
115.         Install fuel plumbing between main tanks-sump tank-firewall fitting
116.         Install Fiberfrax and stainless steel on firewall
117.         Install oil lines to forward oil cooler
118.         Install rudder cable nylaflow in airplane from pedals to the firewall
119.         Bond in rear keel (whale tail) section and install rear aileron bellcrank in keel
120.         Install Aileron push/pull cables through firewall
121.         Install Aileron torque tube
122.         Install Aileron bellcrank and bearing brackets in wing root
123.         Install Rudder hinges
124.         Install rudder horn
125.         Install rudder return spring
126.         Install Aileron hinges
127.         Install rudder cable in airplane and wing nylaflow
128.         Install rudder pulley and cable adjuster between firewall and wing root
129.   ✔︎   Install winglet bottom
130.         Fit top and bottom cowling and flange
131.   ✔︎   Install Door hinges
132.   ✔︎   Install secondary lock in door
133.   ✔︎   Install key lock
134.         Fit door trim panels
135.   ✔︎   Install door gas springs
136.         Assemble seat backs to bases with seat hinges
137.         Install seat belt hardpoints
138.         Remove wings
139.         Engine installation.
140.         Fit fiberfrax and stainless to firewall and install
141.         Install front oil cooler lines and bracket on firewall
142.         Install secondary oil cooler
143.         Install electric fuel pump
144.         Plumb aluminum lines between firewall bulkhead fitting and fuel pump
145.         Install wiring
146.         Mount the engine mount on the engine
147.         Mount the engine on the firewall
148.         Fabricate oil access door
149.         install oil and fuel line plumbing from the airframe to the engine
150.         Install engine senders on firewall and wire
151.         Plumb flexible lines between engine and senders
152.         Jack airplane up and fit brakes to gear legs
154.         Check for toe in and camber. Shim axle to correct
158.         Installed prewired panel
159.         Connect panel wiring to premade harness Harness instruction
160.         Install Throttle , Mixture and Prop control cables
161.         Install pitot tube
162.         Install Static port
163.         Install Pitot/Static system tubing
164.         Install engine cooling plenum and runners to NACA scoops
165.         Cut exhaust exit in cowling
166.         Trim exhaust tubes and permanently install on engine
167.         Install prop and trim or modify rear cowling as necessary to fair in
168.         Install canard
169.         Complete control stick to concentric torque tube installation

99 Skydiving

This entry is part 7 of 10 in the series 99 - Non-Build Topic

About 100 yards from the hangar is Skydive Sebastian that uses a DeHavilland DHC-6 Twin Otter as a jump plane. Every day we hear the plane take off and about 15 minutes later it lands about the same time as all the skydivers. Yesterday I stopped by and asked if I could ride along in the right seat. So once the spar was in, I grabbed a spare headset and rode one of the bikes down to the skydiving center. There were about 12 lunatics… er, I mean skydivers in the back. We climbed up to 13,500 feet and then:

2008-01-29 IMG_5889 2008-01-29 IMG_5890 2008-01-29 IMG_5891 2008-01-29 IMG_5892 2008-01-29 IMG_5893

After the last one was out, I turned to face forward and directly in front of me was this:

2008-01-29 IMG_5894

You figure it out.