6.3.1 Brake lines

This entry is part 9 of 42 in the series 06 - Fuselage

The brake lines were already run from the wheels to the forward cabin. Since it’s just more plumbing, now it’s time to terminate the lines.

Malcolm likes to reverse the elbow and bleeder valve on the calipers. It makes for a cleaner installation.

Front view of the pilot side main gear.

Inside view of the pilot side main gear.

The forward end of the brake lines are connected to the brake pedals. Here are the pilot side pedals.

9.7.1 Fuel Sump Drain

This entry is part 2 of 18 in the series 09 - Fuel System

The manual calls for the sump drain to be installed in the bottom of the sump. A hole is then cut into the bottom of the fuselage.

Malcolm has a different approach. Install the sump drain remotely. Move it forward and to the pilot side. This approach has two benefits. One; In the event of a gear up or gear collapse, the fuel system will remain intact. Two; It is easier to drain the sump to check for fuel contaminates.

First a pilot hole is drilled through the fuselage close to the whaletail and pilot side wiring duct. Then the hole in enlarged from the outside to accommodate the drain valve.

Then the pilot hole is enlarged to accept the tubing.

Finally, the 1/4″ fuel line is run from the sump, through the gear bulkhead to the drain valve elbow.

7.8.2 Landing Gear Plumbing

This entry is part 6 of 39 in the series 07 - Landing Gear

With the landing gear hydraulic hard lines installed, there are two flex lines which go from the dump valve T fittings to the nose gear cylinder. The two flex lines from the main cylinder to the nose cylinder were run in Sebastian.

7.8.2 Landing Gear Plumbing.

This entry is part 5 of 39 in the series 07 - Landing Gear

Now that the bulkhead fittings and the dump valve is installed, it’s time to finish up the landing gear hard line plumbing.

The lines from the bulkhead going aft inside the keel.

Between the bulkhead and the dump valve is the nose gear overcenter stop. So the hard lines have to be bent around that.

The lines aft of the dump valve and the T on the other line will be high-pressure flex lines.

Forward of the canard bulkhead, the line will go from the bulkhead fittings to the hydraulic pump.

At Hangar 18, they take the “Working isn’t good enough. It also has to look good and be aesthetically pleasing to the eye.” approach. The way Malcolm ran these lines is almost a work of art.

 

9.7.1 Fuel Line Installation

This entry is part 1 of 18 in the series 09 - Fuel System

Today was a frustrating day. Task # 40 in the flow chart is “construct sump tank”.  Which I did a couple years ago. Then I had to lop off the lower corners because I’m running a Continental engine. There was no specifics on how much to cut off so I looked at what other builders did and duplicated that.

Now that my engine is installed, I discover that the washers for the engine mounts are interfering with the sump.

The sump tank should not be assembled until the engine has been installed. Then the positioning of the sump and the location of the cutouts can be correctly determined. As it is, we had to spend a fair amount of time adjusting the sump to clear the engine mount washers. But once that was done we can start running the fuel lines.

Here the supply lines from the strakes are run to the sump and the vent lines are started.

And a closeup of the copilot side supply line.

7.8.2 Landing Gear Plumbing – Bulkhead fittings

This entry is part 3 of 39 in the series 07 - Landing Gear

The bulkhead fittings for the hydraulic lines will be located as high on the bulkhead as possible. To identify the optimal location, Malcolm shined a light from the inside of the keel towards the canard bulkhead. Then I marked the canard bulkhead so we could see where the fittings would be located.

Then, two holes where drilled.

And the bulkhead fittings are installed.

7.8.2 Landing Gear Plumbing – Dump Valve

This entry is part 2 of 39 in the series 07 - Landing Gear

Starting the plumbing for the landing gear. Before any lines are run, the emergency dump valve has to be mounted. The dump valve allows the landing gear to be lowered in the event of a loss of electrical power. In the Cessna, this is accomplished with a manual pump. If the hydraulic pump can’t be run, the gear is pumped down manually. On the Velocity, the gear is retracted with hydraulic pressure. When the pressure is released, gravity will pull the gear down. Simple!

Originally, the dump valve was on the pilot side of the center keel. But a while back, it was moved to the co-pilot side. Malcolm has a set of templates to identify the shape and size of the opening for the dump valve.

First the location of the valve is determined. Then the first template is placed and the hole is marked.

Then the first hole is cut and the other templates are placed and marked.

The outer skin and foam are cut away.

Then the foam gets a radius.

Finally, the area is covered with two layers of BID.

13.2.1 Instrument Panel Mounting

This entry is part 3 of 67 in the series 13 - Electrical / Instruments

I mounted the instrument panel a while back. That task involved creating mounting tabs on each side of the fuselage and a mounting tab on the center keel. Then nutplates were riveted to the tabs. It worked fine but the problem is that it will be almost impossible to remove the panel once the engine controls (Throttle, prop and mixture) are installed. There are a couple of approaches to work around this issue. Malcolm’s is to create a sub panel that the engine controls are mounted to and that sub-panel is permanently attached to the fuselage.

First, the location of the engine controls is determined. There’s a bit of guesswork involved since I don’t know what the correct spacing between the controls should be until they’re drilled. So I checked with a couple other builders and came up with 2 – 2.25″ between each control. I went with 2.25″.

This picture shows the left side of the instrument panel with the location of the Throttle, Prop and Mixture controls. I’ve also created the line where EC (Engine Control) sub-panel will be cut away from the main panel.

Partial cuts are made in two places along the two lines. Then structural adhesive is applied to the back of the sub-panel and the whole panel is screwed and clamped into position.

Once the adhesive has cured, the cuts are completed and the main panel is removed leaving the sub panel attached to the inner skin of the fuselage.

Then tape is applied to the front and back of the main panel and a release agent is applied.

The main panel is reinstalled and reinforcing layups are applied to the back of the sub-panel and extended over the back of the main panel. This will create a flange that will be used to connect the main panel and the sub-panel.

View from the back of the panel.

Then holes are drilled through the main panel and flange on the sub-panel and nutplates are installed. After that, the holes for the engine controls are drilled into the EC sub-panel.

Next the EC sub-panel will be painted and the engine controls will be mounted.

 

12.2.1 Cabin Heat

This entry is part 8 of 50 in the series 12 - Engine / Propeller

The cabin heat ducts below the oil cooler were installed when the nose oil cooler ducting was fabricated. Now, holes will be cut into the canard bulkhead and 1.5″ aluminum tubing will be installed.

The hole on the pilot side will be determined by the location of the tube in the nose oil cooler tube. The two are so close that there’s no room for any turns in the flexible scat tubing.

Here’s the co-pilot side tube in the canard bulkhead.

And the pilot side.

And a view of the flexible scat between the outlet duct and the canard bulkhead.