6.3.1 Brake Lines

This entry is part 8 of 42 in the series 06 - Fuselage

Now that the oil lines are in the duct, the brake lines can be run. since there’s not much in the duct, these can be run just by sticking them in the duct. I started at the back with the small hole drilled in the duct between the firewall and the gear bulkhead. A little coaxing and I had the left and right brake lines coming out the forward hole in the duct.

Before the brake ends of the tubing is pushed down the nylaflo that was bonded to the gear leg, I put the lines through a grommet.

Here is the left brake line coming out of the duct and then down to the brake at the bottom of the gear leg.

Both brake lines.

The brake lines coming out the duct by the brake pedals.

12.2.1 Aluminum Oil Lines

This entry is part 7 of 50 in the series 12 - Engine / Propeller

Prior to inserting the oil lines in the duct, Malcolm likes to lay in some old nylaflow tubing. This will be used to pull antenna cables and engine controls through the duct later.

Then the oil lines (and nylaflo) and inserted into the pilot side duct. As they emerge from at the nose, they are bent up to the connectors at the oil cooler. Then the tubing is cut and flared and connected to the oil cooler.

Next, a bracket is placed on the firewall and those ends and flared and connected to a pair of bulkhead adapters.

 

12.2.1 Aluminun Oil Lines

This entry is part 6 of 50 in the series 12 - Engine / Propeller

The engine has an oil cooler located just forward of the number 2 cylinder. But an optional second oil cooler is mounted in the nose of the aircraft. This adds oil cooling capacity and can also be used as a cabin heater.

The air intake, ducting and mounting for the nose oil cooler was done a while back. Now it’s time to run the tubing that will carry the oil to and from the oil cooler.

First the two lines are straightened out (they come in a coil) and then each tube is covered with a layer of heat shrink. The manual says to then insert the two tubes in the pilot side duct. Malcolm says if you do that, the two lines could come into contact and transfer heat between them. Sounds reasonable although I don’t think that you’d get that much heat transfer. Malcolm uses a pair a adel clamps that are then pinned together as spacers. I don’t have 8 adel clamps and that seemed like it would take up space in the duct. So I fabricated my own.

I put two additional layer of heat shrink at four locations along the tubing. Then I cut small strips of aluminum to act as a spacer. Rivet the tabs down and there you go:

Before the oil lines are inserted into the duct, a hole is drilled in the duct just aft of the canard bulkhead (for engine controls, antennas and brakes lines):

Another forward of the landing gear bulkhead (for antennas):

And another forward of the firewall (for brake lines). If the holes aren’t drilled first, drilling holes in the duct could damage the oil lines.

 

6.3.1 Assemble Rudder Pedals

This entry is part 7 of 42 in the series 06 - Fuselage

While I had already assembled the rudder pedals before, I did modify the pilot side pedals to add legroom. And the components aren’t all assembled with locking nuts. So now it’s time for the final assembly.

While I was getting ready to finish the rudder pedals, Malcolm (ever the perfectionist) pointed out something. This is the top of the master cylinder for the co-pilot side, right rudder pedal. It is attached with a long bolt and (right to left) a locking nut, washer, top of master cylinder, three washers and the rudder pedal arm.

This is how the manual says how to do it. So it’s right. Right?

Well that big gap at the top? Not… optimal. And those THREE washers between the arm and master cylinder? A flat surface (washer) up against a curved surface? Again, not optimal.

So here’s the solution:

Custom made spacers that will prevent any binds and keep the ends of the master cylinder from being pinched.

12.1.2 Engine Installation

This entry is part 5 of 50 in the series 12 - Engine / Propeller

Now that the engine cowling is on, the location of the engine has to be determined. The reference point will be the center of the opening in the cowl for the propeller.

With the cowling in place, a plumb line is run from the center of the opening to the floor where I put a mark. Then a measurement is made from the mark on the floor to the center of the opening.

Then the upper cowling is removed and the engine is lowered into position. The engine is then leveled side to side by laying some weight on the left or right cylinders. The plumb line is then dropped down over the end of the crankshaft and the engine to moved side-to-side until the plumb bob is over the mark on the floor. Then a measurement is made from the mark on the floor to the center of the crankshaft.

Once all the dimensions are correct, holes are drilled through the engine frame into the firewall.

Robbie from next door was drafted to help hold the engine in place while I drilled the first hole. After that he got a picture of me drilling the second hole while Malcolm held the engine.

Once all four holes where drilled, temporary bolts are used to hold the engine in position.

Then we put the top cowling back on to check the fit. Unfortunately, it didn’t fit as well as we hoped. The intake tubes on the rear cylinders prevent the top cowling from fitting.

I’m looking into having the intake tubes modified to lower them. If that doesn’t pan out, I’ll have to create some… “bulges” in the upper cowling. 🙁

Next the engine is removed to prepare the firewall for the fiberfrax and titanium. Fiberfrax is a heat resistant ceramic fabric that is applied to the between the firewall and the titanium. Fiberfrax is good up to over 2,000 degree Fahrenheit.

Here’s the firewall with the fiberfrax in place.

The titanium is put over the fiberfrax and screwed in place.

Then the engine is lowered and bolted in place.

The green tape is used to indicate where the center spar caps are located on the other side of the firewall so it’s easy to know where NOT to drill.

12.1.2 Engine Mounts

This entry is part 4 of 50 in the series 12 - Engine / Propeller

Before the engine can be mounted to the airframe, it must first be mounted to the engine mount. The engine mount is what’s known as a “dynafocal” mount. The four bolts all point to the same place which is the center of gravity of the engine.

Here’s the engine mount with the four motor mounts in place.

The trick here is that the bolts can only be screwed in easily when the motor mounts are compressed be tightening the bolts. Which you can’t get in until the motor mounts are compressed by tightening the bolts…  How’s that for a catch-22?

At first, we got the two rear bolts in place but the front bolts were a mile from being in the right position. I called my buddy Albert Khasky. He said that starting the bolts in opposite corners works best. So we started with the left rear. But couldn’t get the front right in position. We tried to move the frame but had no luck. We tried a couple of ways to get the holes to line up. Then I had the idea to use a clamp from one corner of the frame to the opposite corner of the engine. But I couldn’t get the clamp to hold on the engine. So I took a piece of wood and shaped it as a pad.

While I was trying to get the clamp on it, Malcolm said “Hey Don. I think that I can get a small prybar or something between the engine and the mount and pry it into position”.

After that, we had all four bolts in place within about 20 minutes.

Tools of the trade.

Then we moved the plane into the approximate position.

Then we leveled the plane, raised the engine out of the way and attached the cowling.

13.4.2 Static Port

This entry is part 2 of 67 in the series 13 - Electrical / Instruments

While I was waiting for the bolts to arrive, I installed the static ports. The manual calls out 9″ below the canard and 9″ aft of the canard bulkhead. They used to be mounted lower and farther aft but I like the higher/forward position.

Once the location is identified, a .5″ hole is drilled.

The foam is opened up, masking tape is used to cover the static ports, structural adhesive is applied and it’s installed.

14.2.3 Primer

This entry is part 17 of 38 in the series 14 - Final Assembly / FInishing

While I was cutting titanium, Malcolm was sanding rudders, doghouse cover and forward hatch cover.

When he was done, I decided to test something.

When we shot the final coat of primer, there were some… minor blemishes. Runs, basically. Not many, but a couple. Now when I was in high school, I worked at a body shop. In those days, if you screwed up and got a run in the primer, it was no big deal. You simply sanded the run out and then painted. But I’m not going to paint for at least a year. If the run occurred in the paint, then you sanded it out using very fine sandpaper. Depending on the paint, you may go as high as 1500 grit. Then buffed it out. I remember working on a 1972 911S Porsche. The owner wanted (and paid for) a hand rubbed lacquer finish. After painting, the entire car was hand sanded with progressively finer sandpaper and buffed out. The final result was incredible. It was like looking in a mirror.

I wanted to see if I could sand out the runs, and restore the shiny finish. So I brought down sandpaper grits from 400 up to 2000. To start, I only went up to 1000 grit. The finish was very smooth and somewhat glossy. Then I hit it with the buffer. The result was incredible.

And this is primer! 🙂

So now, whenever I get stuck, I’ll work on the runs and sags.

12.1 Engine Installation Prep

This entry is part 3 of 50 in the series 12 - Engine / Propeller

Yesterday, I cut the titanium firewall shield. But some trimming is still required. At Oshkosh, Malcolm had me pickup some grinding stones that supposedly work great on titanium… And they do. I only destroyed two doing the entire firewall. It took about half a day. Put the titanium in place, mark where it’s too big, grind it down and repeat about two-dozen times. You can always take off more but you can’t add any if you take off too much, right?

Next it’s time to attach the engine to the motor mount. But there’s a problem. 🙁

The bolts that were supplied are AN7-36A’s. The manual says to use AN7-34A bolts. Sadly, I need the shorter 34A bolts. So now I have to wait until tomorrow for a delivery from Aircraft Spruce & Speciality.

 

12.1 Engine Installation Prep

This entry is part 2 of 50 in the series 12 - Engine / Propeller

Now that the fuselage finishing is done, it’s time to mount the engine.

The first task is to remove the wings.

Look Ma! No wings!

Then we rotated the plane and got it in about the right location under the chain hoist. We then rolled the engine under the hoist and hooked it up.

Here’s the engine hanging.

Because the engine will need to be leveled, I picked up a leveling beam at Harbor Freight. I had to violate my personal rule on tool purchases. Which is, always buy the best. This comes from an article I read in the woodworking magazine that offered the saying “When you buy the best, you only cry once.”  A proper engine leveling beam costs hundreds of dollars. This one was $39.95!  But I will only need it one time, right? 🙂

Before the engine can be mounted to the firewall, proactive fire protection is needed. In some countries (not ours), a metal barrier must exist between the engine compartment and the cabin. This is a good idea. So Velocity provides a sheet of stainless steel with their engine installation kit. But I didn’t get the stainless steel.

Instead, I picked up a sheet of titanium. Same thickness but half the weight and higher temperature range. 🙂

First I took a large piece of cardboard and made a template.

Then transferred it to the titanium and cut it out.