00 Moving to Hangar 18

This entry is part 26 of 28 in the series 00 - Prep/Logistics

Big changes!

So things have been moving along. I got a bit stalled when the plane got upside-down. The landing gear went okay, but I was having a hard time getting started on putting the wings on and finishing the bottom. I just couldn’t figure out how to get a wing on and without a crew of people to help. But I was getting there. I built a jig to hold the plane at the correct position and was getting ready to attach a wing.

And that’s when my lovely wife told me she was being relocated back to the Atlanta area. Now I was okay with that. The only reason we were up here was her job and it will be nice not having to plow the driveway a couple times per year and get sweet tea, BBQ and grits.

 But then it occurred to me that I had a purpose-built workshop and that we may not find a house in Atlanta that had a workshop to hold the plane. So we made a scouting trip down and I discovered two things:

  1. The chances to finding a home with a suitable workshop were almost non-existent.
  2. The population of metro Atlanta has exploded in the 11 years we’ve been gone. It’s just plain DENSE with people.

And add to that, Ann got an offer that would allow here to work from home most days and she could live anywhere.

So the bottom line is; We’re moving… Again.

Which means that I went into warp drive trying to figure out what to do with the Velocity.

I could rent commercial space or get a hangar to build in. Either of those options would cost something per month but my biggest issue is that I would no longer be able to walk into my shop and spend 30 minutes on something. I would have to drive somewhere which would be at least a 30 minute round trip commute. I would also have to move all of my tools there so when I needed to do something around the house, I’d have to drive 30 minutes to get a wrench! Plus, no internet access (you’d be surprised how much time I spent in my shop looking something up on the internet while building).

So renting space looked like a no-go.

Which brings me to Hangar 18. Malcolm Collier (who I’ve mentioned before) is a professional builder who has built numerous Velocities (He’s been my “go to” guy when I have a question). That’s his business. People buy the kit, ship it to Hanger 18 and spend time there working with Malcolm building their Velocity.

But the economy has been hitting everyone. Malcolm finished his last project almost a year ago and his new builds kept getting pushed back by their builders while they wait out the economy. So he made the decision to shut down Hangar 18 and go to work with a startup company developing a new airplane. Which kept getting pushed back. So I asked if he was interested in “one last build”. And he agreed.

I’m really excited about this for a couple of reasons.

  1. I’m going to have one of (actually THE) best in the business looking at everything that I’ve done. If there’s anything that isn’t right, it’ll be made right.
  2.  No more scratching my head for 2 hours trying to interpret the manual or figuring out how to do something. Now it’s “Hey Malcolm. How does this go together?”
  3.  Labor. There will always be at least 2 people around so when something needs to be moved, lifted, etc…
  4.  Labor (again). Nothing is as tedious as filling, sanding, filling, sanding, filling, sanding. With Me, Malcolm and his worker, it’ll go much faster.

Of course, the downside is I’ll have to spend a couple weeks a month in Greenville, SC. And I’m now going to have to pay for Malcolm’s time and his worker.

But then again, I’ll probably be in the air sooner.

So I’ve spent the last month getting ready for the move. Disassembling some things, packing, organizing, etc.

On July 22nd, Dan Fast (same guy who brought it up 2 1/2 years ago arrived to take it down to SC.

On the trailer and ready to go.

2010-07-22 1149 IMG_0670 2010-07-22 1149 IMG_0672 2010-07-22 1150 IMG_0673

I got a call from Malcolm on the 23rd that the plane arrived and had been offloaded.

2010-08-05 1413 MC 0082010-08-05 1410 MC 001

2010-08-05 1412 MC 0062010-08-05 1411 MC 004

Now I’m looking for a room in Greenville where I’ll spend a couple weeks per month. For now there’s a bunch of filling and sanding and I’ve got to do “real” work for a good part of August so I probably won’t get down there until September.

7.3 Nose Gear Door Mechanism

This entry is part 35 of 39 in the series 07 - Landing Gear

One of the final tasks for the nose gear door mechanism is a spring at the actuator. The gear is retracted with a hydraulic cylinder. But when retracted, it can (and does) move in flight. With a hard link between the nose gear leg and the actuator, the door will constantly be opening slightly when the nose gear bounces.

The fix is to put in a heavy spring between the nose gear leg and the actuator.

So I got a large spring and mounted it to the actuator.

2010-06-07 1508 IMG_05992010-06-07 1508 IMG_06002010-06-07 1508 IMG_0601

Installed.

2010-06-19 1421 IMG_0611 2010-06-19 1421 IMG_0613 (Medium)

 Now when the nose gear moves a bit, the doors will stay closed. A final task is to create an up-stop behind the actuator that will define the closed position of the gear doors.

6.9 Overhead Fresh Air Plenum Installation

This entry is part 16 of 42 in the series 06 - Fuselage

Now that the overhead beams are installed, the modification to the front of the plenum is done and the lighting for the overhead air plenum is finished, it’s time to install the plenum itself. I had to cut away the side where it meets the overhead beam to the B-pillars. Then I spread structural adhesive and riveted the plenum in place. Most builders probably leave it at that, but I put down a 1 BID layup.

Here’s the plenum after the 1 BID layups had cured.

2010-04-14 0903 IMG_0415

2010-04-14 0903 IMG_0416

Then it’s finishing time. Most builders cover the A-pillars, B-pillars, beams and plenum with some type of upholstery (leather, vinyl, cloth, etc).  But since I decided to follow Andy Millin’s lead and paint these parts, it was time to get to work. As much work as the plenum was, it was EASY compared to these surfaces! The plenum was on a workbench. The surfaces I was working on how were not so easy to work with.

But eventually it was time to paint.

Here’s the result:

B-pillar and part of the plenum

2010-06-07 1430 IMG_0598

2010-06-07 1347 IMG_0588

Closeup of the plenum with the map light.

2010-06-07 1347 IMG_0590

Hand hold on the pilot’s side A-pillar.

2010-06-07 1348 IMG_0592 2010-06-07 1348 IMG_0593

Overhead switch panel (with sample switch).

2010-05-22 1643 IMG_0567

2010-06-07 1348 IMG_0591

6.3.2 Front Seat Assembly

This entry is part 37 of 42 in the series 06 - Fuselage

The seats consist of a pan (the part you sit on), a seatback and a hinge. The front seats use a new adjustable hinge which lets you change the angle of the seatback. The rear seats have a fixed angle.

Here are the three parts for one of the front seats. There’s also a rail (not pictured) that the seats mount to which allows you to slide the seat front-to-rear.

2010-06-07 1429 IMG_0594

Now the this adjustable hinge is new and it doesn’t fit to the seat pan very well.

 Here’s the approximate position of the hinge on the seat pan.

2010-04-25 1107 IMG_0528

 But the hinge is wider than the seat pan.

2010-04-25 1108 IMG_0531

Notice the space between one the hinge arms and the seat pan? If I were to screw it in place the hinge would bind.

 The gap is exactly 1/8″. And I just happen to have some extra 1/8″ stock laying around so I made a pair of spacers.

2010-04-25 1108 IMG_0532

 I used structural adhesive to bond these to the sides of the seat pan. Then I marked the holes, drilled and tapped them.

2010-06-07 1429 IMG_0595

 The seatbacks have been redesigned to work with the new hinge so no modifications were needed there. It was simply a matter of drilling and tapping the holes. Then I put everything together.

2010-06-07 1346 IMG_0587

Next I had to mount the finished seats to the rails. Four holes are drilled in the seat pan that go through to the rails. Once I located and drilled the holes, then I started thinking about how to attach the pan to the rail. I could use bolts and nuts, but then I wouldn’t be able to remove the pan from the rail once it had foam and upholstery. And I’ve spent enough time fussing on my current plane about stupid engineers who design things without thinking about someone needing to take it apart later.

So here’s what I did. I cut some 1/2″ aluminum into 1.5″ squares.

2010-05-02 1120 IMAG0004

Then I cut an opening in the top (inside) layer and dug out the foam to make a recess.

2010-05-02 1136 IMAG0005

Then I put the aluminum hardpoint in the recess with structural adhesive.

2010-05-02 1136 IMAG0006

And then cover the hardpoints with a layer of BID. Once it cures, drill and tap the holes.

2010-06-07 1342 IMG_0582

Now the seat can be removed from the rails.

13.5.2 Cabin Lighting

This entry is part 53 of 67 in the series 13 - Electrical / Instruments

First I built my overhead courtesy lights. Click here for a refresher.  I even etched my own circuit boards.

Then I decided to add an “all on” feature which required a circuit board redesign. For version 2, I had the circuit boards etched by a company that specializes in that work.

Then I decided that I wasn’t happy with my dimming choice.  There’s a good chance that I’ll want to dim these lights. My plan was to connect a potentiometer (variable resistor) to the supply side. But LED’s are weird little ducks. With incandescent lights (24 volt, for example), they begin to glow with about 1 volt and get brighter with increasing voltage up to 24 volts. So to dim incandescent lights, you connect a pot (short for potentiometer) that allows you to adjust the voltage going to the lights.  This works just like the dimmer in your house.

But like I said, LED’s are different. First, they’re current driven instead of voltage driven. But to keep things simple, we’ll approach this from the voltage side. The second (and this is what caused my current problem) is there operating range. The LED’s I chose were 3 volt LEDs (I reduced the voltage to the LED’s using a fixed resistor). But here’s where the dimming problem came in. These LED’s don’t start to light until about 2.4 volts. So with the pot installed, you turn it and nothing happens for the first 3/4 of a turn and then the slightest movement of the knob causes a huge difference in brightness for the remaining 1/4 turn.

So I had to educate myself with how to power and dim LED’s. So I started looking for dimmers. I found a guy that makes a bunch of stuff for the experimental aircraft market. He makes a dimmer called EGPAVR (Extraordinarily General Purpose Adjustable Voltage Regulator). With it, you can define the lower and upper voltage levels for your lights. So I picked up a couple and started testing my new design. One other modification I made was to increase the number of LED’s in each fixture. You can always dim or turn them off, but you can’t make them brighter than max brightness.

Here’s my test setup. The LED’s are on the breadboard. The EGPAVR is to the right. A variable resistor used to determine the fixed resistor values is to the right of the EGPAVR and I have two meters to monitor the voltage and current levels.

2010-04-10 1540 IMG_03982010-04-11 1526 IMG_0412

Once I had the values for the fixed resistors determined, I designed my new circuit boards and sent them to be etched. When they came in, I disassembled the old lights and got to work.

The new PCBs

2010-04-10 1539 IMG_0397              

Each card and circuit boards for two light fixtures.

Marked for cutting.

2010-04-10 1547 IMG_0401

And after cutting.

2010-04-10 1556 IMG_0402

Here the light fixtures ready for assembly.

2010-04-10 1543 IMG_0399

Circuit boards have been mounted to the back and holes drilled.

2010-04-11 1347 IMG_0404

Resistors and diode inserted.

2010-04-11 1406 IMG_04052010-04-11 1415 IMG_0406

LEDs mounted.

2010-04-11 1448 IMG_04082010-04-11 1454 IMG_04092010-04-11 1526 IMG_0411

And finally the wiring harness and connector installed

2010-04-11 1721 IMG_0413

 

6.9 Overhead Fresh Air Plenum Modification

This entry is part 15 of 42 in the series 06 - Fuselage

Plenum Modification

The front of the overhead plenum tapers down to the roof. Here’s this picture again where you can see what I mean.
2009-12-17 1045 IMG_9581-1

It occurred to me (after painting the darn thing) that doing the interior is going to be a challenge. Most of the ceiling is covered with a thin flexible board (almost like cardboard) which is covered with fabric or vinyl or leather or whatever you want. But what to do at that taper?

So I decided to lop it off and square is up. After that, I had to paint the area and blend it in with the existing paint.
2010-03-20 1026 IMG_0370 (Large)2010-03-20 1026 IMG_0371 (Large)

6.0 A-Pillar Beam (Overhead Switch Panel)

This entry is part 36 of 42 in the series 06 - Fuselage

The overhead switch panel is the beam which joins the A-pillars across the top. Just like the B-pillar beam, I added a couple BID of carbon fiber inside and out to increase the strength. Next, I had to decide how to join it to the A-Pillars. Here you can see that it doesn’t quite line up.

2010-01-13 0842 IMG_95992010-01-13 0842 IMG_9600

I could mount it as is and transition it or I could cut it down. As I’m taller than the average person, leaving it as is mean that it hangs lower. This COULD become a visual obstruction. It also means a bunch more work where it transitions to the A-pillar. On the down side to cutting it to fit is that I’ll have less room to work with when installing switches.

So I cut it down until if was even with the A-pillars. Then like I did with the B-pillar beam, I made a flange out of carbon fiber uni using the foam rubber trick. Here’s the result on the pilot side (the nylon tube is for routing wires).

2010-02-15 1107 IMG_0128
 Before permanently installing the beam, I needed to cut an opening and create a flange for where the switches would go.

Once again, here’s the beam before the opening:

2009-12-17 1045 IMG_9581

And here it is after:

2010-02-15 1107 IMG_0129
Closeup of the flange and nutplates:
2010-02-15 1108 IMG_0130

With a blank aluminum panel in place:
2010-02-15 1108 IMG_0131

Closeup of the panel:
2010-02-15 1109 IMG_0132

To mount the beam, I used structural adhesive on the inside and a couple layers of carbon fiber uni on the outside of the seam and BID along the front and rear.

This is the beam after mounting and during filling.

2010-03-05 0118 DSC_206

Stuff you don’t think of until it’s (almost) too late.

Andy Millin came up with an absolutely brilliant thought. Rather than run the wiring for the plenum lights all the way from the front to the aft wall of the cabin, then up to the plenum, then forward to the lights; Why not create a tunnel between the inner and outer skin of the roof from the switch panel to the plenum? It’s only 4 inches instead of 20 feet! He did his BEFORE installing the overhead beam. But where there’s a will, there’s a way.

I drilled two holes; one where the forward edge of the plenum will be and the other behind the switch panel.

2010-03-09 1012 DSC_210

Then I started tunneling. Using a sharpened clothes hanger and some other MacGuyver-type tools, I was able to break though. Then I inserted at length of nylon tubing.

2010-03-09 1012 DSC_211

Then I filled the area around the tube with epoxy/micro.
2010-03-09 1047 DSC_2122010-03-09 1048 DSC_2132010-03-09 1048 DSC_214
Once the micro cured, I cut the tubing flush.

15.2.2 Window Trim

This entry is part 4 of 9 in the series 15 - Interior

The kit comes with interior trim pieces for the windshield and rear windows. Apparently, these were made from molds that don’t exactly match the windows. Which means that they require a lot of work to get them to fit and even then, they don’t. So I decided (on the advice of other builders) to make my own.

Here’s the right rear window. The plexiglass is covered so it doesn’t get scratched during building.

2010-02-20 1348 IMG_0154

I covered the window area with duct tape. Here’s the right rear window.

2010-02-21 1504 IMG_0155

Then I covered the edge with four layers of BID.

2010-02-21 1625 IMG_0156

This is the windshield with the layups around the edge.

2010-03-07 0918 IMG_0101

Top is the factory left rear window trim and bottom is mine.

2010-03-07 1026 IMG_0100

In the middle is my one-piece windshield trim and the two-piece factory trim. The windshield trim doesn’t need to be one piece but it’ll be easier to trim it to fit than try to make it bigger.

2010-03-07 1027 IMG_0102

6.9 Overhead Fresh Air Plenum Painting

This entry is part 35 of 42 in the series 06 - Fuselage

Many builders cover the A & B pillars and overhead fresh air plenum. I decided to follow Andy Millin’s example and and use paint for those surfaces. He used a satin finish on his plane.  But the amount of finish work required to get a good result was rather daunting.  So I selected a texture that did a much better job at hiding sins.

So after very little finishing work I sprayed the plenum. The results were very nice.

2010-02-11 0837 IMG_01172010-02-11 0837 IMG_0116

 

2010-02-11 0958 IMG_01222010-02-11 0958 IMG_0121

Inside wiring for the lights

2010-02-11 0957 IMG_0120 2010-02-11 0957 IMG_0119 2010-02-11 0957 IMG_0118

And a quick lighting test.

2010-02-11 1003 IMG_01252010-02-11 1003 IMG_01242010-02-11 1003 IMG_01232010-02-11 1004 IMG_0126