Skip to primary content

The Big Build.

Building the Velocity XL-RG

The Big Build.

Main menu

  • Home
  • About me
  • FAQs
  • Guest Book/Comments
  • Installing the Hendricks Door Handle
  • Table of Contents
  • Wiring Labels

Post navigation

← Previous Next →

00 First Trip Prep

Posted on 12/18/2007 by admin
This entry is part 8 of 28 in the series 00 - Prep/Logistics

00 - Prep/Logistics
  • 00 Task List
  • 00 Shop Prep
  • 00 The trip down to Florida
  • 00 Preparing to leave for the first trip
  • 00 Getting started
  • 00 First trip preparations
  • 00 Inventory
  • 00 First Trip Prep
  • 00 First Trip Prep
  • 00 Purchase
  • 00 Factory visit
  • 00 The Velocity is coming home!
  • 00 Building the shop (Part II)
  • 00 Moving
  • 00 The trip home
  • 00 Building the shop (Part I)
  • 00 Flow chart – Year end
  • 00 – Flow chart
  • 00 Heading to Mecca
  • 00 Plane gone!
  • 00 Registration
  • 00 Airplane Arrives
  • 00 Shop Prep
  • 00 Airplane returns
  • 00 Flipping the Fuselage
  • 00 Moving to Hangar 18
  • 00 Flipping the plane
  • 00 Sebastian Pre-Departure

Instead of flying myself down, I decided to use some of my frequent flyer miles and let American Airlines get me to Sebastian.

I had the factory add a duct (or conduit) in the canard so I can install landing/recognition lights in the canard.

Series Navigation<< 00 Inventory00 First Trip Prep >>
This entry was posted in 2007 by admin. Bookmark the permalink.
Proudly powered by WordPress