- 00 Task List
- 00 Shop Prep
- 00 The trip down to Florida
- 00 Preparing to leave for the first trip
- 00 Getting started
- 00 First trip preparations
- 00 Inventory
- 00 First Trip Prep
- 00 First Trip Prep
- 00 Purchase
- 00 Factory visit
- 00 The Velocity is coming home!
- 00 Building the shop (Part II)
- 00 Moving
- 00 The trip home
- 00 Building the shop (Part I)
- 00 Flow chart – Year end
- 00 – Flow chart
- 00 Heading to Mecca
- 00 Plane gone!
- 00 Registration
- 00 Airplane Arrives
- 00 Shop Prep
- 00 Airplane returns
- 00 Flipping the Fuselage
- 00 Moving to Hangar 18
- 00 Flipping the plane
- 00 Sebastian Pre-Departure
Monday morning at 9am I was at the Velocity office. After introductions I went out to the shop and saw the plane (or what would become the plane) for the first time.
View from the front (Left side).
View from the front (Right side)
Looking in the back from the right door. The doors have been removed and you can see one inside on the floor. In the back you can see some of the main landing gear retract mechanism.
Looking inside to the front from the right door. Once again, you can see parts of the doors and the wheel from the front landing gear. All the windows are covered to protect them from being scratched during construction.
I was introduced to Rick. He would be one of my guides in getting started on this whole project.