5.5.1 Door Lift Gas Struts

This entry is part 3 of 16 in the series 05 - Doors / Windows

Turns out that I was using the wrong length gas struts. Once Malcolm saw my pictures, he noticed that my strut was longer than he was used to seeing. So I picked up a 12″ (extended length) strut from McMaster-Carr, moved the hardpoint and voila! Door stays up when open and doesn’t distort when closed.

Here’s a picture looking forward from the back of the plane with the door closed.

Notice how the direction the strut is pushing is inboard of the hinge. Before the direction of force was outboard of the hinge.

Outside view.

Now I’ve just got to make the hardpoint permanent (it’s only temporary now), patch the holes in the B-pillar and repeat the whole install process on the pilot side door.

11.1 Engine Cowl Mod

This entry is part 5 of 17 in the series 11 - Fairings

Once the epoxy cured, I removed the cowling and flipped it over. A new triax “plug” was cut and epoxied into the hole which was then covered with 2 layers of BID and one layer of carbon fiber BID.

 

5.5.1 Install Door Lift Gas Struts

This entry is part 2 of 16 in the series 05 - Doors / Windows

 

For the B-pillar hardpoint, I decided that since the mount would be in shear, I would use steel instead of aluminum. It only added about 5oz of weight and seemed the best approach. I had some steel from a trailer hitch mount that I cut a piece off of. Drilled and tapped for the stud.

Then I cut a slot into the B-pillar and inserted the hardpoint with some structural adhesive and let it cure overnight.

The next morning, I mounted the gas strut and…

 

From the inside with the door closed:

So far so good at this point. But after a few operations, I made a discovery.

Where I cut the slot to insert the hardpoint weakened the d-tube so that the stress of the 90lb gas strut cracked the fiberglass. When Malcolm builds the doors, he inserts a large piece of aluminum and secures it with structural adhesive and fiberglass. Since my doors are already together, I had to use a plan-B.

I drilled a hole near the hardpoint and injected an epoxy/cabo/flox mixture into the cavity behind the hardpoint. This creates a solid mass that distributes the load over a larger area.

The next morning I put everything back together and it worked.

But then I noticed a new problem. One that almost every builder has fought.

This is a view of top rear of the closed door.

The right, which is higher is the door. The left, which is lower is the fuselage. Now this is before latching the door. Once the latching pins are engaged it’s not as noticeable.  But here’s the problem.

The blue arrows are the hinges for the door. The single red arrow is the gas strut and the direction of the 90lbs of force that reduces the amount of effort required to open the door and hold it open. Since that force is pushing up at the rear, the front hinge becomes the pivot for the whole door. And what is about 3/4″ to the rear of the top hinge becomes about 1.5″ of deflection at the bottom of the door (black arrow).  The end result is that the door can’t be closed easily. I have to push the door forward to get it to close all the way before I can latch the door closed. And throwing the latch isn’t very easy either.

The current factory approach is to reverse the gas strut so it point down when the door is closed. But that just reverses the deflection pushing the door forward.

So I’m currently working on a solution. I’ve got it narrowed down to two candidates.

A) Reinforce the hell out of the top of the door. I determined that the area of the door where the hinges attach is flexing. If I can eliminate the flex, then I will have reduced the amount of deflection.

B) Use two opposing gas struts. When closed, one strut will be applying force upward and the other downward. They should cancel each other out resulting in zero deflection. I think two struts is going to look downright weird, So I’m going with Plan A first.

I’ve ground off the rear hinge pad. Then built up the area with 4 layers of Carbon Fiber BID. Since carbon doesn’t have the flexibility that glass has, I’m hoping this will reduce the flexing. If it does, problem solved. If it doesn’t… Plan B.

 

11.1 Engine Cowl Mod

This entry is part 4 of 17 in the series 11 - Fairings

You may remember all the work that has been done to get the engine to fit: two of the intake tubes were replaced with custom built tubes to clear the cowling and then a hole was cut in the cowling for the main air intake.

Now it’s time to, sadly, modify the cowling so the air intake will fit.

Here’s a side, top and inside view:

 

I drew a shape to provide a symmetrical guide and rounded it out.  Then I made the cut and sanded the surrounding area.

To prevent an “bubble” where the hole was, I made relief cuts around the opening. Then I cut a piece of foam that was a little smaller than the relief cuts to go under the cowling. I large piece of aluminum sheet went under that. Then I made a “plug” out of triax that I covered with duct tape.

Then the area was covered with two progressively larger layers of BID.

5.5.1 Install Door Lift Gas Struts

This entry is part 1 of 16 in the series 05 - Doors / Windows

Once again, I’ve deviating from the manual. I picked up a pair of Hangar 18 designed door gas strut brackets. These are supposed to cause less deformation in the door, operate smoother and be less obtrusive.

First task is to create hardpoints in the D-tubes that make up the door frame. For hardpoints, I’m going to use a 2″ x 1-1/2″ x 1/2″ block of aluminum. First I drilled and tapped the holes in the hardpoint. Then I located the position of the bracket.

Next I marked where I would open up the D-tube to slide the hardpoint in.

I then sanded the inside of the door frame and the aluminum hardpoint. Masking tape is applied to the outside of the door frame and bracket to keep adhesive from sticking to it.

Then I mixed up some structural adhesive with some cabo to thicken it. The adhesive is applied to the door frame and the hardpoint.The hardpoint is then inserted and the bracket is attached until the adhesive sets.

Once it set, I patched the d-tube and moved on to the hardpoint on the b-pillar.

4.2.8 Battery Tray

This entry is part 2 of 5 in the series 04 - Bulkheads

The battery tray was modified a little while back in SC. Now it’s time to install it. Before mounting it, I drilled some large holes to accommodate the wiring that will be going from the ground service connector, landing gear controller, master and starter solenoids. Unfortunately, the connector from the landing gear controller to the power pack is WAY too large so it’ll have to take a different route.

Then I had to decide on how to hold the battery in place. My initial plan was to use “J” hooks. Buy I wasn’t sure how that would work in terms of wearing through the battery tray where the hooks went through. So instead, I used some 1/2″ aluminum and created a bracket that screws to the outside of the tray supports that has a drilled and tapped hole for the rod which holds the battery down.

I then located the battery tray between the master/starter solenoids and the brake reservoir making sure that it cleared the nose gear when it was retracted. Once the location was set, I drilled a few holes, mixed up some structural adhesive and pop-riveted the tray in place.

Once the adhesive had cured, I had to grind a divot in the inner skin. The battery I’m using is just a bit too big so I had to make some space. So I removed the inner shin and some of the foam. Then covered it with 2 layers of BID.

Battery tray with battery mounted.

A view of the corner where I removed the inner skin and foam.

And a view looking down from the top.

7.7.3 Main Gear Doors

This entry is part 10 of 39 in the series 07 - Landing Gear

The build manual has you leave small openings at the bottom of the main landing gear doors. I built small “mini-doors” that will fill this opening. But now I have to figure out how to keep these little doors pushed out against the main gear doors.

Malcolm uses a thin strip of soft foam to apply the necessary outward pressure. But the geometry of my gear legs wont’ allow that. They keep ripping the foam off.

So I came up with a “Plan B” (I love a plan B). I cut a small piece of titanium and mounted it to the fixed side of the hinge. It’s damned near impossible to bend titanium so this tiny piece will hold the small door out with just the right amount of pressure.

 

Here’s the titanium tab sandwiched under the middle nut-plate.

Mounted with the gear up

And with the gear down (You can just see the tab between the gear leg and the door). It clears the gear leg by about 1/8″.

 

13.6.3 Ground Power Receptacle

This entry is part 32 of 67 in the series 13 - Electrical / Instruments

When the battery in a car is unable to start the engine, you can connect a set of jumper cables to get the engine started.  Many FBO’s aren’t real keen on “jumper cables”. Too much potential for connecting them wrong and doing major damage to the aircraft electrical system. Most 28 volt aircraft have ground power connectors. It allows you to connect the single cable to the aircraft with no chance of connecting things wrong.

Albert gave me a Ground Power Receptacle a while back so now all I have to do is figure out where to put it. I was going to put it under the battery tray but once I looked at the size of the plug I realized that wasn’t going to work.

So I put it in the nose. This way, it’s easy to get to on the ground when the nose gear doors are open. People that use the factory nose landing light can’t do this because the landing light is in the way. Yet another advantage of landing lights in the canard.

6A.3.1 Parking Brake

This entry is part 12 of 42 in the series 06 - Fuselage

Sometimes you need to keep the plane from rolling when stopped for a short period of time. Waiting for an IFR clearance, stopped on an uneven surface, etc.

The Cessna has this MacGuyver mechanism with cables that go to the brake pedals and a pull lever that looks like it came out of a ’66 Ford Fairlane.

So this is how I’m going to have a parking brake. A dual cylinder valve goes in between the brake pedals and the calipers. The brakes are activated and while holding the pedals down, the valve is closed which keeps the brake line pressurized.

Here’s the valve on the inside of the left side next to the rudder/brake pedals.

Then the brake lines are cut and connected to the valve assembly.

The next task is to fabricate the linkage to the valve which will connect to a level at the bottom of the instrument panel.

 

00 The trip home

This entry is part 15 of 28 in the series 00 - Prep/Logistics

I flew down (commercial) on Wednesday into GSP. Thursday morning I took a cab to GYH (Donaldson Airport) and picked up the Explorer.

Me and Malcolm spent the next three days finishing up some tasks and then I loaded up all the little stuff (boxes, parts, etc.) into the Explorer. Travis arrived on Sunday morning and we started loading the plane on his trailer. This is a relatively new rig that lets him carry the plane with the engine attached. Earlier versions required removing the engine.

First we had to bolt on a mounting bracket.

Then the front of the plane is lifted onto the trailer.

Next, the back of the plane is raised up with jacks (and in this case, Malcolm’s chain hoist). Once the back of the plane is high enough, Travis backs the trailer up until the plane is in position.

Then a receiver mount is placed under the bracket and the plane is lowered. The landing gear is then retracted.

Under the back of the plane you can see the orange hydraulic jack that will tilt the plane over to it’s transport position.

 

One of Malcolm’s business neighbors is in the industrial surplus business. He gave me a roll of this green plastic material. We think it’s used for protecting cars during transport. So I put it anywhere I thought the plane might get beat up or if I wanted to seal something. I wasn’t sure it would stay on, but I figured that it wouldn’t hurt.

Finally, we loaded up the wings.

Travis pulled out as soon as the plane was loaded.

I hung around for a few minutes and then it was time for me to hit the road.

I left about 3pm on Sunday. I ended driving all the way home. I got in a little after 1am.

Travis showed up around 9am the next morning. We were in get it done mode and it was just us so there aren’t any pictures of the unloading.

But here’s the last picture from the shop cam before it left 18 months ago.

And there’s the first picture from the shop cam after the return.

It’s kind of hard to tell, but it’s a HUGE difference.