6.7.2 Main Spar Installation

This entry is part 20 of 42 in the series 06 - Fuselage

Prior to installing the spar, the airplane is leveled (precisely) side-to-side and front-to-rear.

Normally, the spar is installed before the top fuselage is mated to the bottom. But in a fastbuild, the factory joins the two fuselage parts. This makes installing the spar… challenging. I had previously cut holes in the rear of the fuselage to accept the spar. First the spar is slid through the fuselage to check the position. Since the wing is mounted to the spar, the position of the spar is CRITICAL. First it is checked for center. It must extend out the fuselage equally on both sides (you wouldn’t want one wing longer than the other, right?). This is pretty easy; just measure each end to the center of the firewall. A nudge, measure, a nudge, measure, etc. Then it is checked for level left-to-right. In this case a small shim was needed on the right side. Then the spar is checked for level front-to-rear. The spar was perfectly level in this direction. Finally, the spar is measured for perpendicular to the centerline. This is done by measuring from the nose of the plane to the left end of the spar and comparing it to the right. Both dimensions were identical! This is starting to make me real nervous. This have been about the forth thing that usually requires a bit of adjusting to make it true.

Then the spar is marked for position and removed. Structural adhesive is thickened and liberally applied. Then we slid the spar back in trying to not smear it all over the place. Once it was back in place we had to recheck all the measurements. It only required a couple of tweaks to get it back in the correct position.

Then it’s left to cure overnight.

  2008-01-29 IMG_58872008-01-29 IMG_5888

7.2.1 Nose Gear Installation

This entry is part 22 of 39 in the series 07 - Landing Gear

The final task in completing the nose gear is to install a “captivator” bracket and an upstop. The captivator prevents the nose gear from moving side-to-side when extended. The upstop limits how far the nose gear extends.

The captivator bracket install took almost a whole day. Even with a special tool that Scott made to assist. The two challenges are that the bracket has to be located in a very precise location which can only be determined when the nose gear is down.  But that prevents you from getting to the bracket to drill the mounting holes. The second challenge is there’s just not much room inside the keel.

The upstop was relatively easy.  Just a U-shaped piece of aluminum bolted in to the top of the keel. But once that was done, the airplane was sitting on all three wheels.

2008-01-28 IMG_5884

 

7.2.1 Nose Gear Installation

This entry is part 21 of 39 in the series 07 - Landing Gear

The hole for the nose gear pivot was drilled out earlier. Now the bushings have to be installed. There’s a plate on the inside and outside for each side of the nose gear pivot which gets held in place with structural adhesive and fours bolts (per side).

2008-01-24 1527 IMG_5872  2008-01-24 1526 IMG_5869 2008-01-24 1526 IMG_5870

Once the main pivot had set up, I had to insure the rear pivot point was correctly located. It was. This is the second mounting location that hasn’t required any adjustment. I’m told that they almost always need to be moved a little. This makes me a bit apprehensive. When thing go together too well, I usually think it means that I’m overlooking something. But Scott Swing said it was good so I used epoxy to hold the bushings and mounting plate is place.

Then the hydraulic cylinder is attached.

2008-01-25 1026 IMG_5873

Almost ready for a nose wheel.

2008-01-24 1526 IMG_5871

7.6.1 Main Gear Pulley Installation

This entry is part 20 of 39 in the series 07 - Landing Gear

Because of the amount of force the main gear pulleys receive, a significant amount of reinforcement is needed. This is accomplished with a pair of gussets on either side of the pulleys and numerous layups.

Gussets and layups.

2008-01-22 0759 IMG_5837

Once cured, the pulleys are installed and checked for fit, remove, file some of the bulkhead away to allow movement, put the pulleys back in place and repeat… multiple times. This took most of the day.

But eventually, its cleaned up and the pulley assembly is permanently installed.

2008-01-24 1526 IMG_58682008-01-24 0650 IMG_5863

6.3.7 Keel Installation

This entry is part 19 of 42 in the series 06 - Fuselage

Now that all the inspection panels have been created and the hardpoints put in, it’s time to install the keel.  This is pretty significant since moving around inside the fuselage will be much more difficult once the keel is in.

The location of the keel is marked on the floor of the fuselage and then the front section of the keel in put in position. Holes are drilled in the flanges to hold it in place with cleco’s. Then the position is verified again. Once I’m certain that it’s right, I removed the keel, mixed up a batch of structural adhesive and applied it to the flanges. Then the keel is put back into position and the cleco’s are put in place to hold keel in place while the adhesive cures.

2008-01-22 0758 IMG_5836

Once the adhesive cures, the cleco’s are removed.

2008-01-22 0804 IMG_5839

From inside the keel looking forward at the canard bulkhead.

2008-01-22 0804 IMG_5840

Then it’s time for lot’s of heavy layups. Most of these go around the front of the keel where it attaches to the canard bulkhead.

2008-01-22 1737 IMG_5844 2008-01-22 1736 IMG_5842 2008-01-22 1736 IMG_58432008-01-24 0650 IMG_5862

Once those layups have cured, the holes for the nose landing gear have to be opened back up.

2008-01-24 0649 IMG_5860 2008-01-24 0650 IMG_5861

7.6.1 Main Gear Pulley Installation

This entry is part 19 of 39 in the series 07 - Landing Gear

The main landing gear is retracted by the hydraulic cylinder pulling cables that attach to the top of the landing gear. This cable has to pass through a pair of pulleys at the center of the main gear bulkhead.

The mounting hardware is temporarily held in place and string is used to insure the path of the cables does not rub or bind between where the cylinder is and the top of the gear leg. Once the location has been determined, holes are drilled through the bulkhead.

In this picture, the pulley has been removed.

2008-01-21 0805 IMG_58292008-01-21 0805 IMG_5830

The carpet really helps when you are kneeling.

 

6A.3.1 Rudder Pedal Assembly

This entry is part 18 of 42 in the series 06 - Fuselage

The pilot and copilot rudder pedals are mounted to a pair of concentric torque tubes. I don’t have the actual pedals yet so I installed the four brake master cylinders and torque tube mounting bracket.

2008-01-20 1423 IMG_58172008-01-20 1423 IMG_5818

Once I have the rudder pedals, I’ll install those.

6.3.7 Keel Installation (prep)

This entry is part 17 of 42 in the series 06 - Fuselage

Before the keel gets installed, I removed the hydraulic cylinders and painted epoxy on floor of the fuselage that will be covered by the keel.  In the event of a hydraulic leak, this will prevent the hydraulic fluid from penetrating the fiberglass.

2008-01-20 1458 IMG_5819 2008-01-20 1458 IMG_5820

4.2.3 Main Gear Bulkhead

This entry is part 3 of 5 in the series 04 - Bulkheads

The main gear bulkhead is a structural component which the main landing gear attaches to. This bulkhead gets reinforced with two layers of BID.

Inside of the cabin looking aft. Just in front of the main landing gear is the Main Gear Bulkhead. The gray that goes halfway around the bottom is structural epoxy that holds the bulkhead in place for now. At the bottom on either side are two chases (or channels) that will be used to run electrical cables to the engine compartment. The two cutouts in the center of the bulkhead are where the cables that retract the landing gear go through the bulkhead.
2008-01-19 1321 IMG_5797
Close up of the left, center and right of the bulkhead.
2008-01-19 1321 IMG_57982008-01-19 1321 IMG_57992008-01-19 1321 IMG_5800
The first task is to create a fillet with a “micro-slurry” (epoxy with microscopic bubbles called “micro-balloons” that thicken the epoxy). This rounds over the intersection where the bulkhead meets the fuselage. Then the two layers of BID are applied.

View of bulkhead after the micro-slurry fillet and BID layup. You’ll notice that instead of gray, the joint at the bulkhead is now yellowish. That’s the micro-slurry.
2008-01-19 1538 IMG_5802

2008-01-19 1538 IMG_58032008-01-19 1539 IMG_58052008-01-19 1538 IMG_5804

7.1 Nose Gear Door Installation

This entry is part 18 of 39 in the series 07 - Landing Gear

Once the door hinge tabs had set up, I cut the nose gear door in half. A rather difficult task considering that I was doing it in a somewhat upside down position. But once they were in half, they can be removed and then reinforcement layups are put over the hinge arms and over the hinge tabs to the fuselage.

This the inside of the nose area with the doors removed and the layups on the outside of the hinge tabs.

2008-01-20 0752 IMG_5810

Closeup of the rear tabs.  I have to drill through the layups that cover the holes in the tabs.

2008-01-20 0752 IMG_58112008-01-20 0752 IMG_5812

The (now two) nose gear doors with the layups over the hinge arms.

f   2008-01-20 1127 IMG_5813 2008-01-20 1127 IMG_5814 2008-01-20 1128 IMG_5815 2008-01-20 1128 IMG_5816