Skip to primary content

The Big Build.

Building the Velocity XL-RG

The Big Build.

Main menu

  • Home
  • Guest Book/Comments
  • FAQs
  • Installing the Hendricks Door Handle
  • Wiring Labels
  • Table of Contents
  • About me

Post navigation

← Previous Next →

14.2.3 Final primer on top

Posted on 07/17/2011 by admin
This entry is part 2 of 38 in the series 14 - Final Assembly / FInishing

14 - Final Assembly / FInishing
  • 14.2.3 NO MORE SANDING!
  • 14.2.3 Final primer on top
  • 14.2.2 Last prep before final priming
  • 14.2.2 Sanding
  • 14.2.1 Sanding
  • 14.2.1 Return of the Spotted Dog
  • 14.2.1 Radius (Top)
  • 14.2.2 Priming
  • 14.2.1 Photo op
  • 14.2.1 The ugly nose
  • 14.2.1 Window transistion
  • 14.2.3 Priming
  • 14.2.1 Top side finish
  • 14.2.3 More Painting
  • 14.1.4 Aileron Balancing
  • 14.1.4 Aileron Installation
  • 14.2.3 Primer
  • 14.2.3 Final Prime of the Cowling
  • Back in the saddle again
  • 14.0 – Punchlist
  • Trip 2 completed
  • 14.1.2 Tie Downs
  • 14.2.1 Finishing Bottom of Airplane
  • 14.2.3 Final Primer on Lower Fuselage
  • 14.2.1 Strake Extension
  • 14.2.1 Windows
  • 14.2.1 Finishing Upper Airplane
  • 14.1.10 Calibrating Fuel Tanks
  • 14.99 Contact!
  • 14.1.7 Vortilon Installation
  • 14.99 Engine Run III
  • 14.99 Placards
  • 14.1.7 – Vortilon Installation
  • 14.99 Weight and Balance
  • 14.99 Airworthiness Inspection
  • 14.99 – Painting
  • 14.99 Painting
  • 14.99 Painting Complete

Here’s the view on Sunday morning.

And 5 hours later (Malcolm is working on the second coat):

Series Navigation<< 14.2.3 NO MORE SANDING!14.2.2 Last prep before final priming >>
This entry was posted in 2011 by admin. Bookmark the permalink.
Proudly powered by WordPress