- 12.1 Engine arrival
- 12.1 Engine Installation Prep
- 12.1 Engine Installation Prep
- 12.1.2 Engine Mounts
- 12.1.2 Engine Installation
- 12.2.1 Aluminun Oil Lines
- 12.2.1 Aluminum Oil Lines
- 12.2.1 Cabin Heat
- 12.2.2 Fuel Lines
- 12.2.2 Fuel Lines
- 12.1.2 Intake tube modification
- 12.2.2 Fuel Lines
- 12.1.2 Intake tube modification
- 12.1.2 Intake tube modification (completed)
- 12.3.1 – Installing Throttle, Mixture, and Prop Controls
- 12.3.1 – Mixture Control Mounting Bracket
- 12.3.1 Prop Control Bracket
- 12.3.1 Throttle Control Bracket
- 12.2.3 Cylinder Intake Drain Lines
- 12.2.1 – Aluminum Oil Lines
- 12.3.4 Cooling Plenum
- 12.1.2 Oil Cooler mod
- 12.2.4 Pressure lines
- 12.3.4 Cooling Plenum
- 12.2.4 Pressure Lines
- 12.3.4 Cooling Plenum Intakes
- 12.2.3 Electric Fuel Pump Drain
- 12.2.3 Mechanical Fuel Pump Drain
- 12.2.3 Fuel Pump Drain Lines
- 12.2.3 Spider Drain Line
- 12.3.5 Propeller
- 12.4 Exhaust Installation
- 12.3.6 Nose Oil Cooler
- 12.3.6 Nose Oil Cooler Control
- 12.4 EGT Probe Installation
- 12.2.4 Oil Pressure Sensor (remediation)
- 12.4 Oil breather line
- 12.3.4 NACA duct extensions
- 12.4.2 Exhaust Fairing
- 12.3.6 Cabin Heat Damper Control
- 12.99 Induction Air
- 12.2.2 Fuel Line
- 12.3.6 Nose Mounted Oil Cooler
- 12.99 Engine Woes
- Engine Dehydrator
- Fouled injectors
- 12.99 – Oil temperature and heat challenges
- 12.99 Cabin Heat
- Electronic Ignition
- 12.99 Engine induction air
The electric fuel pump has a drain that must be routed overboard. The port is tiny. It’s a 1/16″ NPT. Since it’s a drain line with no pressure, there’s no need for high-pressure lines. I looked for a 1/16″ NPT to barb fitting but all I could find was an AN4 fitting. So I ended up with aluminum tubing. At least I won’t have to worry about dry-rot on the line. 🙂